WO2017098699A1 - 組立装置及びその制御方法 - Google Patents

組立装置及びその制御方法 Download PDF

Info

Publication number
WO2017098699A1
WO2017098699A1 PCT/JP2016/005001 JP2016005001W WO2017098699A1 WO 2017098699 A1 WO2017098699 A1 WO 2017098699A1 JP 2016005001 W JP2016005001 W JP 2016005001W WO 2017098699 A1 WO2017098699 A1 WO 2017098699A1
Authority
WO
WIPO (PCT)
Prior art keywords
robot
work
predetermined
work areas
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Ceased
Application number
PCT/JP2016/005001
Other languages
English (en)
French (fr)
Inventor
雄司 小堀
誠 利根川
秀樹 高柳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sony Corp
Original Assignee
Sony Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sony Corp filed Critical Sony Corp
Priority to EP16872601.6A priority Critical patent/EP3388190A4/en
Priority to CN201680070671.2A priority patent/CN108367401B/zh
Priority to US15/780,863 priority patent/US10611027B2/en
Publication of WO2017098699A1 publication Critical patent/WO2017098699A1/ja
Anticipated expiration legal-status Critical
Ceased legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25JMANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES
    • B25J9/00Programme-controlled manipulators
    • B25J9/16Programme controls
    • B25J9/1656Programme controls characterised by programming, planning systems for manipulators
    • B25J9/1664Programme controls characterised by programming, planning systems for manipulators characterised by motion, path, trajectory planning
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P21/00Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control
    • B23P21/004Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control the units passing two or more work-stations whilst being composed
    • B23P21/006Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with programme control the units passing two or more work-stations whilst being composed the conveying means comprising a rotating table
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25JMANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES
    • B25J13/00Controls for manipulators
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25JMANIPULATORS; CHAMBERS PROVIDED WITH MANIPULATION DEVICES
    • B25J9/00Programme-controlled manipulators
    • B25J9/0084Programme-controlled manipulators comprising a plurality of manipulators
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/18Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form
    • G05B19/402Numerical control [NC], i.e. automatically operating machines, in particular machine tools, e.g. in a manufacturing environment, so as to execute positioning, movement or co-ordinated operations by means of programme data in numerical form characterised by control arrangements for positioning, e.g. centring a tool relative to a hole in the workpiece, additional detection means to correct position
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/40Robotics, robotics mapping to robotics vision
    • G05B2219/40409Robot brings object near operator, operator places object in correct position
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10TECHNICAL SUBJECTS COVERED BY FORMER USPC
    • Y10STECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y10S901/00Robots
    • Y10S901/02Arm motion controller
    • Y10S901/06Communication with another machine
    • Y10S901/08Robot

Definitions

  • the present technology relates to an assembling apparatus including a plurality of robots used for assembling electronic equipment, for example, and a control method thereof.
  • various industrial robot apparatuses are used in the assembly and transfer processes of workpieces in the production line of electronic equipment and electronic parts.
  • improvement in work efficiency is required.
  • Patent Document 1 an installation member in which each work area is arranged around, an automatic assembly device provided in the center of the installation member, a self-propelled carriage that assists the loading and unloading of the workpiece with respect to the installation member, A component supply device is described.
  • a series of processes from assembling to unloading of the workpiece can be shared by the automatic assembly apparatus and the self-propelled carriage, thereby improving the work efficiency.
  • an object of the present technology is to provide an assembling apparatus capable of increasing productivity and a control method for the assembling apparatus.
  • an assembly apparatus includes a work table, a first robot, a second robot, and a controller.
  • the work table has a mounting surface on which a plurality of workpieces are placed, and the plurality of workpieces are individually circulated to a plurality of work areas arranged along a circumference at regular intervals.
  • the first robot is disposed inside the circumference and configured to be accessible to the plurality of work areas.
  • the second robot is arranged outside the circumference and configured to be accessible to at least one work area among the plurality of work areas.
  • the controller causes the first robot to execute a predetermined process within the predetermined time for each work on a predetermined plurality of work areas of the plurality of work areas, and
  • the second robot is configured to execute an operation for assisting the processing of the first robot with respect to the workpiece on at least one work area.
  • the assembly apparatus is configured such that the assembly work of the workpiece by the first robot is assisted by the second robot.
  • the cycle time of the entire apparatus is not affected by the assembly work of the first robot having a long cycle time, and as a result, the cycle time of the entire apparatus can be shortened compared to the conventional techniques. Therefore, according to the present technology, it is possible to provide an assembling apparatus that can realize further improvement in productivity when manufacturing electronic devices and electronic components.
  • the assembly apparatus further includes a component storage unit that stores the first component,
  • the predetermined plurality of work areas include a first assembly area in which the first part is assembled to the workpiece,
  • the controller causes the second robot to perform an operation of transporting the first component from the component storage unit to a relay position set between the first robot and the component storage unit. You may make the said 1st robot perform the operation
  • the assembly apparatus may further include a component support base that is disposed at the relay position and can support the first component.
  • the second robot can indirectly transfer the first part to the first robot via the part support base. Therefore, it is not necessary for the second robot to wait until the first part is delivered to the first robot, and the work efficiency of the second robot can be improved.
  • the predetermined plurality of work areas include a second assembly area in which a second part is assembled to the workpiece,
  • the controller may cause the second robot to perform an operation of assembling the second part to the workpiece in the second assembly region.
  • the first robot performs a predetermined assembly operation in a work area different from the second assembly area in parallel. Can be done. Therefore, productivity until the work is assembled is improved.
  • the controller determines whether or not the predetermined processing by the first robot for each of the workpieces on the predetermined plurality of work areas can be performed within the predetermined time. Instead of the first robot, the second robot may be caused to execute the predetermined process.
  • the subsequent assembly that the first robot is scheduled to perform is performed.
  • the work is taken over by the second robot, and the work of assembling the work is shared by the first and second robots. Therefore, the cycle time until the workpiece W is assembled is kept within the target cycle time, and the cycle time of the entire apparatus is prevented from being increased.
  • the assembly apparatus further includes an auxiliary device that is disposed outside the circumference and that performs a predetermined process on the work on a work area different from the predetermined work areas within the predetermined time. May be.
  • the work assembling work is shared by the first and second robots and the auxiliary device, and the time until the work is assembled is shortened and the productivity is improved.
  • the workbench is composed of a rotary table that rotates by a predetermined angle every fixed time,
  • the first robot may be installed in the center of the rotary table without contact with the rotary table.
  • the assembly apparatus may further include a gantry unit having a first gantry that supports the first robot and a second gantry independent of the first gantry.
  • the both cradles are not desired. Installation accuracy can be ensured. Thereby, compared with the case where two mounts are isolate
  • an assembly apparatus includes a work table, a first robot, a second robot, and a controller.
  • the work table has a mounting surface on which a plurality of workpieces are placed, and the plurality of workpieces are individually circulated to a plurality of work areas arranged along a circumference at regular intervals.
  • the first robot is disposed inside the circumference and configured to be accessible to the plurality of work areas.
  • the second robot is arranged outside the circumference and configured to be accessible to at least one work area among the plurality of work areas.
  • the controller is configured to cause the first robot and the second robot to perform a predetermined process on a work on a predetermined plurality of work areas of the plurality of work areas within the predetermined time. Is done.
  • the work assembly work is shared by the first and second robots. Therefore, the cycle time until the workpiece W is assembled can be shortened as compared with the conventional technology, and the productivity can be further improved.
  • a method for controlling an assembly apparatus includes: A plurality of works are circulated individually to a plurality of work areas arranged along the circumference at regular intervals, Causing the first robot arranged inside the circumference to execute a predetermined process on each of the workpieces on a predetermined plurality of work areas among the plurality of work areas within the predetermined time period; A second robot arranged outside the circumference is caused to execute an operation for assisting the processing of the first robot with respect to the workpiece on at least one of the predetermined plurality of work areas.
  • FIG. 1 is a schematic plan view illustrating a configuration of a production system according to an embodiment of the present technology. It is a disassembled perspective view of the principal part of a workpiece
  • FIG. 1 is a schematic plan view showing a configuration of a production system 1 according to an embodiment of the present technology.
  • the X axis, the Y axis, and the Z axis indicate the three axial directions orthogonal to each other, the X axis and the Y axis correspond to the horizontal direction, and the Z axis corresponds to the height direction (in the following drawings). The same).
  • the production system 1 includes a conveyance line 100 that conveys the workpiece W and an assembling apparatus 200, as shown in FIG.
  • the conveyance line 100 includes a first conveyance conveyor 101 that conveys the workpiece W (W1) before assembly, and a second conveyance conveyor 102 that conveys the workpiece W (W2) after assembly.
  • the first transport conveyor 101 and the second transport conveyor 102 are each configured by a linear conveyor that linearly transports the workpieces W1 and W2 along the X-axis direction, but of course not limited thereto, at least one of them is You may be comprised with the conveyor which can convey a workpiece
  • FIG. 2 is an exploded perspective view of a main part of the workpiece W.
  • the workpiece W includes a workpiece W1 before assembly and parts A to C assembled to the workpiece W1.
  • the production system 1 is configured to sequentially attach the parts A to C to the device main body (work) W1 in a semi-finished state to manufacture and transport the work W2.
  • the workpiece W is not particularly limited, and examples thereof include electric / electronic parts, mechanical parts, or products and unit devices composed of an assembly of these parts. Specifically, electronic equipment equipped with an optical disk drive or the like is employed. Is done.
  • the component A is a metal shield member, and the component B and the component C are plastic cover members.
  • the present invention is not limited to this.
  • the workpiece W is placed in a lying posture such that the side on which the parts A and B are attached is vertically upward on the transfer line 100, and the work W is maintained on the work table 50 while the attitude is maintained. Be transported.
  • the present invention is not limited to this, and the posture of the workpiece W can be appropriately changed according to the configurations of the transfer line 100 and the assembly apparatus 200.
  • the assembling apparatus 200 includes a work table 50, a first robot 10 as a first robot (A), a second robot 20 as a second robot (B), and a controller. 80.
  • FIG. 3 is a schematic plan view showing the main part of the assembling apparatus 200.
  • the work table 50 according to the present embodiment includes a work table 51.
  • the work table 51 includes a fixed table portion 52 and a rotary table portion 53 provided in the inner peripheral area of the fixed table portion 52 as shown in FIG.
  • the rotary table unit 53 has a plurality of work areas P1 to P8 arranged at equal angular intervals along the circumference.
  • the workpiece W is sequentially transferred to a plurality of work areas P1 to P8 on the rotary table unit 53, and predetermined work set in advance in each of the work areas P1 to P8, for example, mounting or assembly of parts, posture change, etc. are performed. Is done.
  • the workpiece W is transferred from the transfer line 100 (first transfer conveyor 101) to the work area P1, passes through the work areas P2 to P8, and returns to the transfer line 100 (second transfer conveyor 102). Returned.
  • the rotary table unit 53 is configured by an index table capable of intermittently rotating around the Z axis (FIG. 1) at a predetermined angular pitch within the mounting surface.
  • the rotary table unit 53 includes a plurality of cradles R that can support the workpiece W.
  • the plurality of cradles R are installed at equal angular intervals in each work area.
  • eight workpieces W are arranged on the cradle R at equal angular intervals (45 degree intervals). Therefore, the rotary table 53 is configured to rotate in a certain direction (for example, clockwise in FIG. 3) at a 45 degree pitch.
  • the rotary table unit 53 rotates at a 45-degree pitch every predetermined time.
  • the predetermined time is set to a time during which predetermined processing including loading / unloading of the workpiece W (W1, W2) can be performed at each rotational position of the rotary table unit 53.
  • the predetermined time is set based on the longest time required for processing among the work performed in each work area.
  • the rotary table unit 53 is configured to rotate the work W conveyed to the work area P1 individually from the work areas P1 to P8 at regular intervals.
  • said fixed time is the intermittent rotation period (time when the rotary table part 53 is still) of the rotary table part 53, and is set as "time T1" in subsequent description.
  • an opening 50 a for installing the first robot 10 is provided at the center of the rotary table 53, and between the opening 50 a and the first robot 10. A certain gap is formed in.
  • the first robot 10 is arranged in a non-contact manner with the rotary table portion 53 (opening 50a), and therefore the occurrence of vibration of the work table 51 due to contact with the first robot 10 is prevented. Is done.
  • the shape of the rotary table part 53 which concerns on this embodiment is circular as shown in FIG. 3, it is not limited to this, It can be set as arbitrary shapes, such as a rectangular shape.
  • FIG. 4 is a schematic perspective view showing a main part of the work table 50
  • FIG. 5 is a cross-sectional view of the main part when the work table 50 is viewed from the front direction (a cross-sectional view taken along line [A]-[A] in FIG. 6). is there.
  • FIG. 6 is a plan view of the main part of the work table 50.
  • the X-axis and Y-axis directions indicate horizontal directions orthogonal to each other, and the Z-axis indicates a height direction orthogonal to these.
  • the work table 50 includes a gantry unit 54 that supports the work table 51 and the first robot 10 in common as shown in FIG.
  • the gantry unit 54 includes a three-dimensional metal frame having a framework structure. Further, the height of the gantry unit 54 is set so that the first robot 10 and the work table 51 can be installed at predetermined heights H1 and H2 from the floor surface S shown in FIG.
  • the gantry unit 54 includes a first gantry 540, a second gantry 550, and a connecting frame 560.
  • the first mount 540 is formed of a three-dimensional metal frame.
  • the first mount 540 includes a first upper end 540T that supports the first robot 10 and a first bottom 540B that is installed on the floor surface S.
  • the first mount 540 further has a combined structure of a first base frame 541 and a second base frame 542.
  • the first base frame 541 has a skeleton structure including the first bottom portion 540B. That is, the first base frame 541 includes a plurality of shaft members 541x extending in the X-axis direction, a plurality of shaft members 541y extending in the Y-axis direction, and a plurality of shaft members 541z extending in the Z-axis direction. It is composed of a frame having a three-dimensional structure in which shaft members are combined with each other.
  • the first bottom portion 540B is configured by a frame surface parallel to the floor surface S.
  • the second base frame 542 has a skeleton structure including the first upper end 540T. That is, the second base frame 542 includes a plurality of shaft members 542x extending in the X-axis direction, a plurality of shaft members 542y extending in the Y-axis direction, and a plurality of shaft members 542z extending in the Z-axis direction. It is comprised by the frame of the three-dimensional structure which combined the shaft member of each other.
  • the first upper end portion 540T is configured by a frame surface parallel to the floor surface S.
  • the plurality of shaft members 542x, 542y, and 542z constituting the second base frame 542 have shorter shaft lengths than the plurality of shaft members 541x, 541y, and 541z constituting the first base frame 541.
  • the second base frame 542 configured in this manner is installed at the upper center of the first base frame 541.
  • the first base frame 541 and the second base frame 542 are combined or integrated with the plurality of shaft members by bolt fastening or welding.
  • the length, cross-sectional shape, thickness and the like of each of the shaft members are not particularly limited, and are designed so as to obtain predetermined rigidity and strength that can stably support the first robot 10.
  • the second base frame 542 is configured to be detachable from the first base frame 541.
  • the second base frame 542 is detached from the first base frame 541 together with the first robot 10.
  • the configuration of the second base frame 542 can be optimized according to the type of the first robot 10.
  • the second mount 550 is formed of a three-dimensional metal frame.
  • the second base 550 has a second upper end portion 550T that supports the work table 51 and a second bottom portion 550B installed on the floor surface S.
  • the second mount 550 has a skeleton structure including a second bottom portion 550B and a second upper end portion 550T, and is configured to surround the first mount 540.
  • the second bottom portion 550B and the second upper end portion 550T are each configured by a frame surface parallel to the floor surface S.
  • the second frame 550 includes a main body frame portion 551 and a plurality of auxiliary frame portions 552.
  • the main body frame portion 421 includes a plurality of shaft members 421x extending in the X-axis direction, a plurality of shaft members 421y extending in the Y-axis direction, and a plurality of shaft members 421z extending in the Z-axis direction. It is comprised by the rectangular parallelepiped frame body which mutually combined.
  • the plurality of shaft members 551x, 551y, 551z constituting the main body frame portion 551 have a longer axial length than the plurality of shaft members 541x, 541y, 541z constituting the first base frame 541.
  • the shaft member 551z along the Z-axis direction has an axial length larger than the sum of the shaft member 541z of the first base frame 541 and the shaft member 542z of the second base frame 542.
  • the plurality of auxiliary frame portions 422 are installed on the four side surfaces of the main body frame portion 421, respectively.
  • the auxiliary frame portion 422 includes a plurality of shaft members 422x extending in the X-axis direction, a plurality of shaft members 422y extending in the Y-axis direction, and a plurality of shaft members 422z extending in the Z-axis direction. It is comprised by the rectangular parallelepiped frame body which mutually combined.
  • the upper surfaces of the auxiliary frame portions 552 and the main body frame portion 551 are configured to be flush with each other, thereby forming a second upper end portion 550T.
  • a plurality of bolt fastening holes for fixing the work table 51 are provided at appropriate positions of the second upper end portion 550T.
  • the lower surfaces of the auxiliary frame portions 552 and the main body frame portion 551 are formed to be flush with each other, thereby forming the second bottom portion 550B.
  • the second bottom portion 550B is fixed to the floor surface S via a plurality of anchor bolts (not shown).
  • the fixing positions by these anchor bolts are not particularly limited.
  • the gantry unit 54 is fixed to the floor surface S at a plurality of fixing positions on the auxiliary frame portion 552 indicated by a symbol P in FIG.
  • the main body frame portion 551 and the auxiliary frame portion 552 are combined or integrated with the plurality of shaft members by bolt fastening or welding.
  • the length, cross-sectional shape, thickness and the like of each of the shaft members are not particularly limited, and are designed so as to obtain predetermined rigidity and strength capable of stably supporting the work table 51.
  • connection frame 560 includes a plurality of shaft members that connect the first bottom portion 540B and the second bottom portion 550B to each other.
  • the first bottom portion 540B and the second bottom portion 550B are formed on the same plane.
  • the connection frame 560 includes a plurality of shaft members parallel to the plane.
  • the connection frame 560 includes a plurality of shaft members 560x extending in the X-axis direction.
  • a plurality of shaft members extending in the Y-axis direction may be used.
  • the plurality of shaft members 560x constituting the connection frame 560 may be constituted by independent shaft members, or may be constituted in common with the shaft members constituting the first frame 540 or the second frame 550.
  • the shaft member 560x is configured by a shaft member common to the shaft member 540x constituting the first bottom portion 540B, and is bolted or welded to the shaft member 551y of the main body frame portion 551 constituting the second bottom portion 550B. Are joined together.
  • the connecting frame 560 is provided between the first bottom portion 540B and the second bottom portion 550B, the first and second mounts 540, 540, from the first upper end portion 540T to the second upper end portion 550T.
  • a plurality of shaft members constituting 550 are interposed.
  • the first base 540 has a combined structure of the first and second base frames 541 and 542, and the second base frame 542 is narrower than the first base frame 541. Therefore, the reach distance from the first upper end 540T, which is the vibration surface, to the connection frame 560 is extended by way of the shaft members 540x and 540y. Accordingly, it is possible to further improve the function of preventing vibration transmission to the work table 51 while increasing the rigidity and strength of the first mount 540.
  • the edge of the vibration transmission path is cut at a fixed position with the floor surface S.
  • An effect can be produced.
  • the fixing position by the anchor bolt is set immediately below the shaft member (support) extending in the Z-axis direction, whereby the above effect can be made more remarkable. Note that the same effect as described above can also be obtained by setting the fixing position by the anchor bolt to the connection frame 560.
  • the first gantry 540 and the second gantry 550 are integrated via the connection frame 560.
  • the connection frame 560 For example, when the apparatus is started up or when the line layout is changed. The desired installation accuracy of the two racks 540 and 550 can be ensured. Thereby, compared with the case where two mounts are isolate
  • the first robot 10 is arranged at the center of the work table 50 and is configured to be rotatable around the Z axis. Further, the first robot 10 is installed on the first upper end 540T of the first mount 540 so as to protrude upward from the opening 50a of the work table 50. Thus, the first robot 10 can access all of the plurality of work areas P1 to P8 on the work table 50 (the rotary table unit 53).
  • the first robot 10 is connected to the articulated arm 11, the hand unit 12 connected to the distal end of the articulated arm 11, and the proximal end of the articulated arm 11. And a drive unit 13.
  • the articulated arm 11 is composed of, for example, a vertical articulated arm, but is not limited to this, and is not limited to this. Other types of articulated arms such as a mold may be used.
  • the drive unit 13 is fixed between the articulated arm 11 and the second base frame 542 of the first mount 540, and drives the articulated arm 11 and the hand unit 12 based on a control command transmitted from the controller 80.
  • the controller 80 controls operations such as expansion / contraction of the articulated arm 11, turning around the Z axis, and rotation of the hand unit 12.
  • the controller 80 operates the first robot 10 in a predetermined sequence by executing a program stored in the memory of the controller.
  • the second robot 20 is configured to be rotatable around the Z-axis, and is disposed at a position where at least one of the plurality of work areas P1 to P8 can be accessed outside the work table 50.
  • the second robot 20 can typically have the same configuration as the first robot 10, but is not limited thereto. Note that the configuration of the second robot 20 may be changed as appropriate according to the configuration of the assembling apparatus 200.
  • the operations of the first and second robots 10 and 20 and the rotation operation of the rotary table unit 53 are controlled by the controller 80.
  • the controller 80 is typically composed of a computer.
  • the controller 80 may be configured to control the operation of the transport line 100.
  • the controller 80 may be configured as a part of the assembling apparatus 200, or may be configured as a control apparatus different from the assembling apparatus 200.
  • the assembly apparatus 200 includes a third robot 30 as a third robot (C), first to third component storage units 40a to 40c, and a component support base. 70 and first to third auxiliary devices 60a to 60c for assisting in assembling the workpiece W.
  • a third robot 30 as a third robot (C)
  • first to third component storage units 40a to 40c and a component support base.
  • 70 and first to third auxiliary devices 60a to 60c for assisting in assembling the workpiece W.
  • the third robot 30 is disposed outside the work table 50 at a position close to the work table 50 and the transfer line 100, and before the assembly from the first transfer conveyor 101 to the work table 50.
  • the work W1 is transported and the assembled work W2 can be transported from the work table 50 to the second transport conveyor 102.
  • 1st component storage part 40a is arrange
  • a component A to be attached to the workpiece W is placed in the first component storage portion 40a.
  • the second and third component storage units 40 b and 40 c are arranged at positions accessible by the second robot 20 outside the work outside 50.
  • the component B is placed in the second component storage portion 40b
  • the component C is placed in the third component storage portion 40c.
  • the first to third component storage units 40a to 40c are not particularly limited, but are typically component shelves such as stockers on which components to be attached to the workpiece W can be placed.
  • the component support table 70 is disposed outside the work table 50 and in the vicinity of the work area P ⁇ b> 6, and is provided vertically above the third auxiliary device 60 c.
  • the component support base 70 is configured to be able to support the component B.
  • the position where the component support base 70 is disposed is disposed between the first robot 10 and the second component storage portion 40b as shown in FIG. This is a relay position that is indirectly passed to one robot.
  • the component support table 70 according to the present embodiment is not particularly limited as long as it is a support table (mounting table) that can support the component B.
  • the first auxiliary device 60 a is arranged outside the work table 50 at a position near the work area P ⁇ b> 3, and is configured to be capable of screwing the work W on which the part A is assembled.
  • the second auxiliary device 60b is arranged at a position near the work area P5 outside the work table 50, and is configured to be capable of screwing the work W on which the parts A and B are assembled. .
  • the third auxiliary device 60c is arranged outside the work table 50 at a position near the work area P6.
  • the third auxiliary device 60c is a reversing device to which the part A and the part B are attached and configured to reverse the front and back of the work W that is screwed.
  • FIG. 7 is a flowchart showing steps from the loading of the workpiece W1 to the unloading of the workpiece W2 by the assembling apparatus 200.
  • the assembling apparatus 200 carries in the workpiece W1 before assembling, the assembling operation of the workpiece W, and the workpiece W2 after assembling at each rotational position while rotating the rotating table portion 53 of the work table 51 at an equal angular pitch every predetermined time. Execute unloading.
  • the operation of the assembling apparatus 200 is controlled by the controller 80.
  • the assembling apparatus 200 has a plurality of work areas P1 to P8.
  • the work area P1 also serves as an area into which the workpiece W1 before assembly is carried.
  • the third robot 30 carries the workpiece W1 before assembly from the transfer line 100 (first transfer conveyor 101) to the work area P1 (St101).
  • the first robot 10 picks up the component A from the first component storage unit 40a on which the component A is placed in advance (St102).
  • time T1 time
  • the rotary table unit 53 rotates one pitch (45 °) clockwise, and the work W1 is conveyed to the work area P2.
  • the first robot 10 assembles the part A on the work W1 transported from the work area P1 (St103). Then, after a lapse of a certain time (time T1) after the work W1 is conveyed to the work area P2, the rotary table 53 rotates clockwise by one pitch (45 °), and the work W on which the part A is assembled becomes the work area. Transported from P2 to P3.
  • the first auxiliary device 60a performs screw tightening of the work W on which the part A conveyed from the work area P2 is assembled (St104).
  • the second robot 20 picks up the component B from the second component storage portion 40b on which the component B is previously placed (St105), and transfers the component B to the component support base 70 (St106).
  • the first robot 10 picks up the component B from the component support base 70 (St107).
  • time T1 time
  • the rotary table 53 rotates clockwise by one pitch (45 °), and the workpiece W is working. Transported from region P3 to P4.
  • the first robot 10 assembles the part B on the work W transferred from the work area P3 (St108). Then, after a lapse of a certain time (time T1) after the work W is transferred to the work area P4, the rotary table 53 rotates one pitch (45 °) clockwise, and the work in which the parts A and B are assembled. W is transported from work area P4 to P5.
  • the second auxiliary device 60b tightens the screw of the work W conveyed from the work area P4 (St109). Then, after a lapse of a certain time (time T1) after the workpiece W is transferred to the work area P3, the rotary table 53 rotates one pitch (45 °) clockwise, and the parts A and B are assembled and screwed The tightened work W is conveyed from the work area P5 to P6.
  • the front and back of the workpiece W conveyed from the work area P5 by the third auxiliary device 60c is reversed (St110).
  • the second robot 20 picks up the component C from the third component storage unit 40c on which the component C is previously placed (St111).
  • time T1 a certain time
  • the rotary table 53 rotates by one pitch (45 °) clockwise, so that the work W is turned upside down. In the state, it is conveyed to the work area P7.
  • the second robot 20 assembles the part C from the side opposite to the side where the parts A and B are assembled to the workpiece W conveyed from the work area P6 (St112).
  • the workpiece W2 is assembled.
  • the rotary table 53 rotates clockwise by one pitch (45 °), and the work W2 is transferred from the work area P7 to P8. Is done.
  • the workpiece W2 transferred to the work area P8 is carried out by the third robot 30 to the transfer line 100 (second transfer conveyor 102) (St113).
  • the work area P8 also serves as an area where the assembled work W2 is carried out.
  • the rotary table 53 rotates one pitch (45 °) clockwise, and the third robot 30 again causes the transport line 100 ( The workpiece W1 before assembly is carried into the work area P1 from the first conveyor 101).
  • the assembling apparatus 200 repeatedly carries out the above-described steps (St101 to St113), thereby sequentially transporting the workpiece W from the work area P1 to the work area P8, and performing a predetermined assembly work in each work area. .
  • the assembling work by the assembling apparatus 200 is performed until the work W2 is assembled from the work W1.
  • the controller 80 controls the drive of the rotary table unit 53, the first and second robots 10, 20, and the like, thereby operating the entire apparatus in a predetermined cycle time.
  • the cycle time of the apparatus is the cycle time of the work requiring the most time.
  • the cycle time of the entire apparatus cannot be made shorter than the cycle time of the longest assembly work.
  • the assembling apparatus 200 specifically solves the above problem as follows.
  • FIG. 8 is a diagram illustrating the flow of the sequence operation of the first and second robots 10 and 20 with time.
  • the operation of the assembling apparatus 200 will be described as an example immediately after the rotary table portion 53 rotates by one pitch and immediately after the workpiece W is placed on the plurality of work areas P2 to P8.
  • the first robot 10 picks up the part A from the first part storage 40a.
  • the second robot 20 picks up the component B from the second component storage portion 40b.
  • the first robot 10 picks up the part B transferred from the second part storage unit 40b to the part support base 70 by the second robot 20 during the assembly work of the part A to the workpiece W1
  • the first robot 10 picks up the part B.
  • the second robot 20 picks up the component C from the third component storage unit 40c.
  • the second robot 20 picks up the part picked up from the third part storage unit 40c. C is assembled to the workpiece W in the work area P7.
  • the loading and unloading of the work (W1, W2) of the third robot 30 within the time T1 The screwing of the second auxiliary devices 60a and 60b and the reversing operation of the third auxiliary device 60c are performed in parallel with the above operation.
  • the first to third robots 10 to 30 can also be driven while the rotary table 53 is rotating (FIG. 8 (T2)).
  • the assembly work of the workpiece W by the first and second robots 10 and 20 and the first to third auxiliary devices 60a to 60c is performed in parallel in each work area.
  • the cycle time of the entire apparatus does not depend on the work of assembling the work W, which takes the longest time.
  • the assembly work of the workpiece W is mainly performed by the first robot 10 that can access all of the plurality of work areas, and thus has a long cycle time. .
  • the assembly apparatus 200 of the present embodiment is such that the assembly work of the workpiece W, which is primarily performed by the first robot 10, is assisted by the second robot 20 and a plurality of auxiliary devices.
  • the cycle time (time T1) until the workpiece is carried in / out is shorter than the conventional technology.
  • the cycle time of the assembling apparatus 200 can be shortened, so that further improvement in productivity can be realized when manufacturing electronic devices and electronic components.
  • the time T1 is about 40 seconds, but is not limited to this.
  • the first robot 10 is installed in the opening 50a formed at the center of the rotary table 53, so that the first robot 10 is connected to each work area P1 to P8. Are located at the same distance. Thereby, since the first robot 10 can access a plurality of work areas, it is not necessary to additionally provide a plurality of robots when assembling the workpiece W, and the entire apparatus can be made compact.
  • the assembly apparatus includes a workbench 50, first and second robots 10 and 20, and a controller. Also in this embodiment, the assembly apparatus is similar to the first embodiment described above in that the first to third component storage portions 40a to 40c, the first to third auxiliary devices 60a to 60c, and the components And a support base 70.
  • the work table 50, the first and second robots 10 and 20, the first to third auxiliary devices 60a to 60c, the first to third component storage units 40a to 40c, and the component support table 70 are the first embodiment. Although it has the same configuration as that of the embodiment, the controller of the present embodiment executes different control in the following points as compared with the controller 80 of the first embodiment.
  • the controller 80 controls the operation of the second robot 20 and the like so as to assist the assembly work of the workpiece W of the first robot 10.
  • the controller in the present embodiment further controls the operations of the first and second robots 10, 20 and the like so that the assembly work of the workpiece W is shared over a plurality of work areas.
  • the controller of the present embodiment allows the first robot 10 to perform assembly work on a plurality of predetermined work areas within a predetermined time (time T1) based on the assembly time of the first robot 10 in the predetermined work area. If it is determined whether or not it can be performed, and if it is determined that it cannot be performed, the first robot 10 is scheduled to be performed in the predetermined work area by the second robot 20 instead of the first robot 10. Assembly work can be performed.
  • the controller of the present embodiment is the first robot.
  • the subsequent assembly work (for example, FIG. 7 (St108) shown in FIG. 7) that is scheduled to be performed by the second robot 20 can be executed by the second robot 20. Accordingly, the assembly of the workpiece W can be performed within the time T1.
  • the controller performs the same determination as described above using the operation time of the second robot 20 and the like, so that the work of assembling the workpiece W is performed with the first robot 10 and the second robot. It can also be shared by the robot 20.
  • the assembling apparatus of the present embodiment is scheduled to be performed by the second robot 20 when the operation of the second robot 20 (for example, FIG. 7 (St105 or St106)) exceeds the target tact time.
  • Subsequent assembly work (for example, FIG. 7 (St111 and St112)) can be performed by the first robot 10 instead of the second robot 20.
  • the assembly of the workpiece W can be performed within the time T1 as described above.
  • the assembling apparatus of this embodiment can share the work of assembling the workpiece W between the first and second robots 10 and 20.
  • the cycle time (time T1) from the loading of the workpiece W1 to the unloading of the workpiece W2 is kept within the target cycle time, and the cycle time of the entire apparatus is prevented from being prolonged. Therefore, productivity equivalent to that of the first embodiment described above can be maintained.
  • the second frame 550 is disposed so as to surround the first frame 540, but the layout of both frames is not particularly limited.
  • the number of mounts is not limited to two, and the present technology can be applied to various mount structures in which three or more mounts are connected via a connecting frame.
  • the workpiece W is not limited to the example of being conveyed by the rotary table unit 53, and may be conveyed by the first robot 10 disposed at the center of the work table 50.
  • the assembling apparatus is configured to convey the workpiece W at a predetermined angle pitch along the circumference by using the rotation index table.
  • the circumference is not limited to the circumference of a perfect circle, and may be a circumference such as a semicircle, an ellipse, an arc, or a circle having a curvature close to 0, for example.
  • a single assembly operation is performed for each workpiece on a plurality of work areas.
  • the present invention is not limited to this, and two or more assembly operations may be performed.
  • the configuration is such that one of the first or second robots 10 and 20 can be assembled by the other robot.
  • the controller may cause the first or second robot 10 or 20 to execute a predetermined assembly operation by the auxiliary device.
  • this technique can also take the following structures.
  • a work table having a mounting surface on which a plurality of works are placed, and a plurality of work pieces that are individually circulated to a plurality of work areas arranged along a circumference at regular intervals;
  • a first robot disposed inside the circumference and accessible to the plurality of work areas;
  • a second robot disposed outside the circumference and capable of accessing at least one of the plurality of work areas;
  • the first robot is caused to execute a predetermined process within the predetermined time for each work on a predetermined plurality of work areas of the plurality of work areas, and at least one of the predetermined plurality of work areas
  • An assembly device comprising: a controller configured to cause the second robot to execute an operation for assisting the processing of the first robot with respect to the workpiece on a work area.
  • the predetermined plurality of work areas include a first assembly area in which the first part is assembled to the workpiece,
  • the controller causes the second robot to perform an operation of transporting the first component from the component storage unit to a relay position set between the first robot and the component storage unit.
  • An assembling apparatus further comprising a component support base arranged at the relay position and capable of supporting the first component.
  • the predetermined plurality of work areas include a second assembly area in which a second part is assembled to the workpiece,
  • the controller causes the second robot to perform an operation of assembling the second part to the workpiece in the second assembly region.
  • the controller determines whether or not the predetermined processing by the first robot for each of the workpieces on the predetermined plurality of work areas can be performed within the predetermined time. An assembling apparatus that causes the second robot to execute the predetermined process in place of the first robot.
  • An assembly apparatus further comprising an auxiliary device that is arranged outside the circumference and that performs a predetermined process on the work on a work area different from the predetermined work areas within the predetermined time.
  • the workbench is composed of a rotary table that rotates by a predetermined angle every fixed time, The first robot is installed in the center of the rotary table in a non-contact manner with the rotary table.
  • An assembly apparatus further comprising: a gantry unit having a first gantry that supports the first robot and a second gantry independent of the first gantry.
  • a work table having a mounting surface on which a plurality of workpieces are mounted, and a plurality of work pieces that are individually circulated to a plurality of work areas arranged along a circumference at regular intervals;
  • a first robot disposed inside the circumference and accessible to the plurality of work areas;
  • a second robot disposed outside the circumference and capable of accessing at least one of the plurality of work areas;
  • a controller that causes the first robot and the second robot to perform predetermined processing on the workpieces on a predetermined plurality of work areas of the plurality of work areas within the predetermined time;
  • An assembling apparatus comprising: (10) A plurality of works are circulated individually to a plurality of work areas arranged along the circumference at regular intervals, Causing the first robot arranged inside the circumference to execute a predetermined process on each of the workpieces on a predetermined plurality of work areas among the plurality of work areas within the predetermined time period;
  • An assembling apparatus that causes a second robot arranged outside the circumference

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Robotics (AREA)
  • Human Computer Interaction (AREA)
  • Manufacturing & Machinery (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Automatic Assembly (AREA)
  • Manipulator (AREA)

Abstract

本技術の一形態に係る組立装置は、作業台と、第1のロボットと、第2のロボットと、コントローラとを有する。作業台は、複数のワークが載置される載置面を有し、円周に沿って配列された複数の作業領域へ複数のワークを個々に一定時間毎に巡回させる。第1のロボットは、円周の内側に配置され、複数の作業領域にアクセス可能に構成される。第2のロボットは、円周の外側に配置され、複数の作業領域のうち少なくとも1つの作業領域にアクセス可能に構成される。コントローラは、複数の作業領域のうち所定の複数の作業領域上のワーク各々に対して一定時間内における所定の処理を第1のロボットに実行させ、所定の複数の作業領域のうち少なくとも1つの作業領域上のワークに対する第1のロボットの処理を補助する動作を第2のロボットに実行させるように構成される。

Description

組立装置及びその制御方法
 本技術は、例えば電子機器の組立などに用いられる複数台のロボットを備えた組立装置及びその制御方法に関する。
 例えば、電子機器や電子部品の製造ラインにおけるワークの組立及び搬送工程には、種々の産業用ロボット装置が用いられている。この種の産業用ロボット装置においては、例えば、作業効率の向上等が要求されている。
 例えば特許文献1には、各作業エリアが周囲に配置された設置部材と、上記設置部材の中央に設けられた自動組立装置と、上記設置部材に対するワークの投入及び搬出を補助する自走台車とを備えた部品供給装置が記載されている。これにより、ワークの組立から搬出までの一連の工程が自動組立装置と自走台車により分担できるので、作業効率の向上を可能としている。
特開昭59-73246号公報
 しかしながら、特許文献1に記載の技術では、ワークの全組立工程を自動組立装置が行っているため、ワークの組立に要する時間が自動組立装置の作業能力に依存してしまう。これにより、ワークの組立から搬送までの作業全体の時間短縮に限界が生じ、電子機器や電子部品を製造する上で、生産性の更なる向上が困難となる課題がある。
 以上のような事情に鑑み、本技術の目的は、生産性を上げることが可能な組立装置及びこの組立装置の制御方法を提供することにある。
 上記目的を達成するため、本技術の一形態に係る組立装置は、作業台と、第1のロボットと、第2のロボットと、コントローラとを有する。
 上記作業台は、複数のワークが載置される載置面を有し、円周に沿って配列された複数の作業領域へ上記複数のワークを個々に一定時間毎に巡回させる。
 上記第1のロボットは、上記円周の内側に配置され、上記複数の作業領域にアクセス可能に構成される。
 上記第2のロボットは、上記円周の外側に配置され、上記複数の作業領域のうち少なくとも1つの作業領域にアクセス可能に構成される。
 上記コントローラは、上記複数の作業領域のうち所定の複数の作業領域上のワーク各々に対して上記一定時間内における所定の処理を上記第1のロボットに実行させ、上記所定の複数の作業領域のうち少なくとも1つの作業領域上の上記ワークに対する上記第1のロボットの処理を補助する動作を上記第2のロボットに実行させるように構成される。
 上記組立装置は、第1のロボットによるワークの組立作業が第2のロボットによって補助されるように構成される。これにより、装置全体のサイクルタイムが、長大なサイクルタイムを有する第1のロボットの組立作業に左右されなくなり、結果的に装置全体のサイクルタイムをこれまでの技術より短縮させることが可能となる。従って、本技術によれば、電子機器や電子部品を製造する上で、生産性の更なる向上を実現することが可能な組立装置を提供することができる。
 上記組立装置は、第1の部品を収納する部品収納部をさらに具備し、
 上記所定の複数の作業領域は、上記ワークに上記第1の部品が組み付けられる第1の組立領域を含み、
 上記コントローラは、上記第1のロボットと上記部品収納部との間に設定された中継位置へ上記第1の部品を上記部品収納部から搬送する動作を上記第2のロボットに実行させ、上記中継位置に搬送された上記第1の部品を取得し上記第1の組立領域で上記ワークに組み付ける動作を上記第1のロボットに実行させてもよい。
 これにより、第1のロボットが部品収納部から第1の部品を取得する必要がなくなり、第1のロボットが第1の部品を取得するまでの時間が短縮される。従って、第1のロボットの作業能率が向上し、ワークの組立の時間の更なる短縮が可能となる。
 上記組立装置は、上記中継位置に配置され、上記第1の部品を支持可能な部品支持台をさらに具備してもよい。
 これにより、第2のロボットは部品支持台を介して第1の部品を間接的に第1のロボットへ渡すことができる。従って、第2のロボットは第1の部品を第1のロボットへ渡すまで待機する必要がなくなり、第2のロボットの作業能率の向上を実現することが可能となる。
 上記所定の複数の作業領域は、上記ワークに第2の部品が組み付けられる第2の組立領域を含み、
 上記コントローラは、上記第2の組立領域で上記第2の部品を上記ワークに組み付ける動作を上記第2のロボットに実行させてもよい。
 これにより、第2のロボットが第2の組立領域で上記ワークに第2の部品を組み付けている間に、第1のロボットは第2の組立領域とは異なる作業領域で所定の組立作業を並行して行うことができる。従って、ワークが組み立てられるまでの生産性が向上される。
 上記コントローラは、上記所定の複数の作業領域上のワーク各々に対する上記第1のロボットによる所定の処理が上記一定時間内に遂行可能か否かを判定し、遂行不可能と判断したときは、前記第1のロボットに代わって前記第2のロボットに前記所定の処理を実行させてもよい。
 これにより、所定の複数の作業領域上のワーク各々に対する第1のロボットによる所定の処理が上記一定時間内に遂行不可能であってとしても、第1のロボットが実行予定であったその後の組立作業が第2のロボットに引き継がれ、ワークの組立作業が第1及び第2のロボットにより分担される。従って、ワークWが組み立てられるまでのサイクルタイムが、目標とするサイクルタイムに収められ、装置全体のサイクルタイムの長時間化が抑制される。
 上記組立装置は、上記円周の外側に配置され、上記所定の複数の作業領域とは異なる作業領域上の上記ワークに対して所定の処理を上記一定時間以内に実行する補助装置をさらに具備してもよい。
 これにより、ワークの組立作業が第1及び第2のロボットと補助装置により分担されることとなり、ワークが組み立てられるまでの時間が短縮され、生産性が向上される。
 上記作業台は、上記一定時間毎に所定角度ずつ回転する回転テーブルで構成され、
 上記第1のロボットは、上記回転テーブルとは非接触で上記回転テーブルの中心部に設置されてもよい。
 これにより、第1のロボットとの接触による回転テーブルの振動の発生が防止され、複数の作業領域上の各々のワークに対して所定の処理を確実に行うことが可能となる。
 上記組立装置は、上記第1のロボットを支持する第1の架台と、上記第1の架台とは独立した第2の架台とを有する架台ユニットをさらに具備してもよい。
 本技術の架台ユニットにおいては、第1の架台及び第2の架台が連結フレームを介して一体化されているため、例えば、装置の立ち上げ時やラインのレイアウト変更時において、両架台の所望とする設置精度を確保することができる。これにより、2つの架台が分離している場合と比較して、架台ユニットの設置作業性を高めることができる。
 上記目的を達成するため、本技術の一形態に係る組立装置は、作業台と、第1のロボットと、第2のロボットと、コントローラとを有する。
 上記作業台は、複数のワークが載置される載置面を有し、円周に沿って配列された複数の作業領域へ上記複数のワークを個々に一定時間毎に巡回させる。
 上記第1のロボットは、上記円周の内側に配置され、上記複数の作業領域にアクセス可能に構成される。
 上記第2のロボットは、上記円周の外側に配置され、上記複数の作業領域のうち少なくとも1つの作業領域にアクセス可能に構成される。
 上記コントローラは、上記複数の作業領域のうちの所定の複数の作業領域上のワークに対して上記一定時間内に上記第1のロボット及び上記第2のロボットにより所定の処理を実行させるように構成される。
 これにより、ワークの組立作業が第1及び第2のロボットにより分担される。従って、ワークWが組み立てられるまでのサイクルタイムをこれまでの技術よりも短縮することがき、生産性の更なる向上を実現することが可能となる。
 上記目的を達成するため、本技術の一形態に係る組立装置の制御方法は、
 円周に沿って配列された複数の作業領域へ複数のワークを個々に一定時間毎に巡回させ、
 上記円周の内側に配置された第1のロボットに、上記一定時間内に、上記複数の作業領域のうち所定の複数の作業領域上のワーク各々に対する所定の処理を実行させ、
 上記円周の外側に配置された第2のロボットに、上記所定の複数の作業領域のうち少なくとも1つの作業領域上の上記ワークに対する上記第1のロボットの処理を補助する動作を実行させる。
 以上のように、本技術によれば、生産性を上げることが可能な組立装置及びこの組立装置の制御方法を提供することができる。なお、ここに記載された効果は必ずしも限定されるものではなく、本開示中に記載されたいずれかの効果であってもよい。
本技術の一実施形態に係る生産システムの構成を示す概略平面図である。 ワークの要部の分解斜視図である。 本技術の一実施形態に係る組立装置の要部を示す概略平面図である。 上記組立装置の作業台の要部を示す概略斜視図である。 上記作業台を正面方向から見た要部の断面図である。 上記作業台の要部の平面図である。 上記組立装置よるワークの搬入/搬出までの工程を示すフロー図である。 上記組立装置の第1及び第2のロボットのシーケンス動作の経時的な流れを示す図である。
 以下、本技術に係る実施形態を、図面を参照しながら説明する。
 (第1の実施形態)
 図1は、本技術の一実施形態に係る生産システム1の構成を示す概略平面図である。なお、図においてX軸、Y軸及びZ軸は、相互に直交する3軸方向を示しており、X軸及びY軸は水平方向、Z軸は高さ方向に相当する(以下の各図においても同様)。
 <<生産システムの概要>>
 本実施形態において、生産システム1は、図1に示すように、ワークWを搬送する搬送ライン100と組立装置200とを有する。
 <搬送ライン>
 搬送ライン100は、組立前のワークW(W1)を搬送する第1の搬送コンベヤ101と、組立後のワークW(W2)を搬送する第2の搬送コンベヤ102とを有する。第1の搬送コンベヤ101及び第2の搬送コンベヤ102はそれぞれX軸方向に沿ってワークW1,W2を直線的に搬送する直線コンベヤで構成されるが、勿論これに限られず、少なくとも何れか一方がワークを曲線状に搬送することが可能なコンベヤで構成されてもよい。
 (ワークについて)
 図2は、ワークWの要部の分解斜視図である。ワークWは、図2に示すように、組立前のワークW1と、ワークW1に組み付けられる部品A~Cを含む。ここで、生産システム1は、図2に示すように、半完成状態である機器本体(ワーク)W1に部品A~Cを順次取り付けて、ワークW2を製造し、搬送するように構成される。
 ワークWは特に限定されず、例えば、電気・電子部品や機械部品、あるいはこれら部品の集合体からなる製品やユニット機器などが挙げられ、具体的には光ディスクドライブ等を搭載した電子機器等が採用される。また、本実施形態では、部品Aは金属製のシールド部材であり、部品B及び部品Cはプラスチック製のカバー部材であるが、これに限定されるものではない。
 また、本実施形態ではワークWは、搬送ライン100上において部品A及び部品Bが取り付けられる側が鉛直上方側となるように横臥した姿勢で載置され、当該姿勢が維持されたまま作業台50へ搬送される。なおこれに限られず、ワークWの姿勢は、搬送ライン100及び組立装置200の構成に応じて適宜設定変更可能である。
 <組立装置>
 続いて、組立装置200の構成について説明する。組立装置200は、図1に示すように、作業台50と、第1のロボット(A)としての第1のロボット10と、第2のロボット(B)としての第2のロボット20と、コントローラ80とを有する。
 [作業台]
 図3は、組立装置200の要部を示す概略平面図である。本実施形態に係る作業台50は、作業テーブル51を備える。作業テーブル51は、同図に示すように、固定テーブル部52と、固定テーブル部52の内周領域に設けられた回転テーブル部53とを有する。
 回転テーブル部53は、図3に示すように、円周に沿って等角度間隔で配列された複数の作業領域P1~P8を有する。ワークWは、回転テーブル部53上の複数の作業領域P1~P8に順次搬送され、各作業領域P1~P8において予め設定された所定の作業、例えば、部品の取り付け又は組み立て、姿勢変換等が実施される。後述するように、ワークWは、搬送ライン100(第1の搬送コンベヤ101)から作業領域P1へ搬送され、各作業領域P2~P8を経て、再び搬送ライン100(第2の搬送コンベヤ102)に戻される。
 回転テーブル部53は、載置面内において所定角度ピッチでZ軸(図1)まわりに間欠的に回転することが可能なインデックステーブルで構成される。本実施形態では、回転テーブル部53は、ワークWを支持することが可能な複数の受け台Rを有する。複数の受け台Rは、図3示すように、各作業領域に等角度間隔で設置されている。これにより、8個のワークWが等角度間隔(45度間隔)で受け台Rに配置される。このため回転テーブル部53は、45度ピッチで一定方向(例えば図3において時計方向)に回転するように構成される。
 また、回転テーブル部53は、所定時間ごとに45度ピッチで回転する。上記所定時間は、回転テーブル部53の各回転位置において、ワークW(W1,W2)の搬入/搬出を含む所定の処理を実施することができる時間に設定される。典型的には、上記所定時間は各作業領域で行われる作業のうち、処理に要する時間が最も長い時間を基準に設定される。
 つまり、本実施形態に係る回転テーブル部53は、作業領域P1に搬送されたワークWを各作業領域P1からP8へワークWを個々に一定時間毎に巡回させるように構成される。なお、上記の一定時間とは、回転テーブル部53の間欠回転周期(回転テーブル部53が静止している時間)であり、以降の説明では「時間T1」とする。
 さらに、回転テーブル部53の中心部には、図3に示すように、第1のロボット10を設置するための開口部50aが設けられており、開口部50aと第1のロボット10との間には一定の隙間が形成される。これにより、第1のロボット10は、回転テーブル部53(開口部50a)とは非接触で配置されることとなるので、第1のロボット10との接触による作業テーブル51の振動の発生が防止される。なお、本実施形態に係る回転テーブル部53の形状は図3に示すように円形であるが、これに限定されず、矩形状等任意の形状とすることができる。
 (架台ユニット)
 図4は作業台50の要部を示す概略斜視図であり、図5は作業台50を正面方向から見た要部の断面図(図6における[A]-[A]線断面図)である。また、図6は作業台50の要部の平面図である。各図においてX軸及びY軸方向は相互に直交する水平方向を示し、Z軸はこれらに直交する高さ方向を示している。
 本実施形態に係る作業台50は、図5に示すように、作業テーブル51と第1のロボット10を共通に支持する架台ユニット54を有する。架台ユニット54は、図4に示すように、骨組み構造を有する立体的な金属製の枠体で構成される。また、架台ユニット54は、図5に示す床面Sから所定の高さH1、H2の位置にそれぞれ第1のロボット10及び作業テーブル51を設置可能にその高さが設定されている。
 また、架台ユニット54は、図4~図6に示すように、第1の架台540と、第2の架台550と、連結フレーム560とを有する。
 (第1の架台)
 第1の架台540は、立体的な金属製の枠体で構成される。第1の架台540は、第1のロボット10を支持する第1の上端部540Tと、床面Sに設置される第1の底部540Bとを有する。
 第1の架台540は、さらに、第1のベースフレーム541と、第2のベースフレーム542との組み合わせ構造を有する。
 第1のベースフレーム541は、第1の底部540Bを含む骨組み構造を有する。すなわち第1のベースフレーム541は、X軸方向に延びる複数の軸部材541xと、Y軸方向に伸びる複数の軸部材541yと、Z軸方向に延びる複数の軸部材541zとを含み、これら複数の軸部材を相互に組み合わせた立体構造の枠体で構成される。第1の底部540Bは、床面Sに平行な枠面で構成される。
 第2のベースフレーム542は、第1の上端部540Tを含む骨組み構造を有する。すなわち第2のベースフレーム542は、X軸方向に延びる複数の軸部材542xと、Y軸方向に伸びる複数の軸部材542yと、Z軸方向に延びる複数本の軸部材542zとを含み、これら複数の軸部材を相互に組み合わせた立体構造の枠体で構成される。第1の上端部540Tは、床面Sに平行な枠面で構成される。
 第2のベースフレーム542を構成する複数の軸部材542x,542y,542zは、第1のベースフレーム541を構成する複数の軸部材541x,541y,541zよりも短い軸長を有する。このように構成された第2のベースフレーム542は、第1のベースフレーム541の上部中央に設置される。
 第1のベースフレーム541及び第2のベースフレーム542は、上記複数の軸部材をボルト締結あるいは溶接等により結合あるいは一体化される。上記各軸部材の長さ、断面形状、太さ等は特に限定されず、第1のロボット10を安定に支持することができる所定の剛性及び強度が得られるように設計される。
 本実施形態において、第2のベースフレーム542は、第1のベースフレーム541に対して着脱可能に構成される。この場合、第2のベースフレーム542は、第1のロボット10と共に第1のベースフレーム541に対して取り外される。これにより、第1のロボット10の種類に応じて第2のベースフレーム542の構成を最適化することができる。
 (第2の架台)
 第2の架台550は、第1の架台540と同様に、立体的な金属製の枠体で構成される。第2の架台550は、作業テーブル51を支持する第2の上端部550Tと、床面Sに設置される第2の底部550Bとを有する。
 第2の架台550は、第2の底部550Bと第2の上端部550Tとを含む骨組み構造を有し、第1の架台540を囲むように構成される。第2の底部550B及び第2の上端部550Tは、それぞれ床面Sに平行な枠面で構成される。本実施形態において第2の架台550は、本体フレーム部551と、複数の補助フレーム部552とを有する。
 本体フレーム部421は、X軸方向に延びる複数の軸部材421xと、Y軸方向に伸びる複数の軸部材421yと、Z軸方向に延びる複数本の軸部材421zとを含み、これら複数の軸部材を相互に組み合わせた直方体形状の枠体で構成される。
 本体フレーム部551を構成する複数の軸部材551x,551y,551zは、第1のベースフレーム541を構成する複数の軸部材541x,541y,541zよりも長い軸長を有する。本実施形態では、Z軸方向に沿った軸部材551zは、第1のベースフレーム541の軸部材541zと第2のベースフレーム542の軸部材542zとの和よりも大きい軸長を有する。
 複数の補助フレーム部422は、本体フレーム部421の四側面にそれぞれ設置される。補助フレーム部422は、X軸方向に延びる複数の軸部材422xと、Y軸方向に延びる複数の軸部材422yと、Z軸方向に延びる複数本の軸部材422zとを含み、これら複数の軸部材を相互に組み合わせた直方体形状の枠体で構成される。
 各補助フレーム部552及び本体フレーム部551各々の上面は、相互に面一となるように構成され、これにより第2の上端部550Tが形成される。第2の上端部550Tの適宜の位置には、作業テーブル51を固定するための複数のボルト締結孔が設けられている。
 一方、各補助フレーム部552及び本体フレーム部551各々の下面は、相互に面一となるように形成され、これにより第2の底部550Bが形成される。第2の底部550Bは、図示しない複数のアンカーボルトを介して床面Sに固定される。これらアンカーボルトによる固定位置は特に限定されず、例えば図6において符号Pで示す補助フレーム部552上の複数の固定位置において、架台ユニット54が床面Sに固定される。
 本体フレーム部551及び補助フレーム部552は、上記複数の軸部材をボルト締結あるいは溶接等により結合あるいは一体化される。上記各軸部材の長さ、断面形状、太さ等は特に限定されず、作業テーブル51を安定に支持することができる所定の剛性及び強度が得られるように設計される。
 (連結フレーム)
 連結フレーム560は、第1の底部540Bと第2の底部550Bとを相互に連結する複数の軸部材で構成される。第1の底部540B及び第2の底部550Bは、それぞれ同一の平面上に形成される。連結フレーム560は、当該平面に平行な複数の軸部材で構成され、本実施形態では、図6に示すように、X軸方向に延びる複数の軸部材560xで構成されるが、これに代えて又はこれに加えて、Y軸方向に延びる複数の軸部材で構成されてもよい。
 連結フレーム560を構成する複数の軸部材560xは、それぞれ独立した軸部材で構成されてもよいし、第1の架台540又は第2の架台550を構成する軸部材と共通に構成されてもよい。本実施形態において軸部材560xは、第1の底部540Bを構成する軸部材540xと共通の軸部材で構成され、第2の底部550Bを構成する本体フレーム部551の軸部材551yにボルト締結あるいは溶接により一体的に接合されている。
 連結フレーム560が第1の底部540Bと第2の底部550Bとの間に設けられるため、第1の上端部540Tから第2の上端部550Tに至るまでに、第1及び第2の架台540,550を構成する複数の軸部材が介在することになる。これにより、第1のロボット10を支持する第1の上端部540Tから作業テーブル51を支持する第2の上端部550Tまでの振動伝達経路を最大限長くすることができる。したがって、第1のロボット10の旋回、伸縮等の動作に伴って発生する振動が、ワークW(受け台R)が載置される作業テーブル51へ伝達しにくくなり、ワークWの組立作業を安定かつ適正に実施することが可能となる。
 特に本実施形態において、第1の架台540は、第1及び第2のベースフレーム541,542の組み合わせ構造を有し、かつ、第2のベースフレーム542が第1のベースフレーム541よりも幅狭に構成されているため、振動面である第1の上端部540Tから連結フレーム560までの到達距離が、軸部材540x,540yを経由する分延長される。これにより、第1の架台540の剛性及び強度を高めつつ、作業テーブル51への振動伝達阻止機能のさらなる向上を図ることができる。
 また、本実施形態によれば、第2の架台550の第2の底部550Bを複数のアンカーボルトで床面Sに固定しているため、当該床面Sとの固定位置において振動伝達経路の縁切り効果を生じさせることができる。特に、第1及び第2の架台540,550においてZ軸方向に延びる軸部材(支柱)の直下にアンカーボルトによる固定位置を設定することで、上記効果をより顕著なものとすることができる。なお、当該アンカーボルトによる固定位置を連結フレーム560に設定することによっても、上述と同様の効果を得ることができる。
 さらに、本実施形態の架台ユニット54においては、第1の架台540及び第2の架台550が連結フレーム560を介して一体化されているため、例えば、装置の立ち上げ時やラインのレイアウト変更時において、両架台540,550の所望とする設置精度を確保することができる。これにより、2つの架台が分離している場合と比較して、架台ユニットの設置作業性を高めることができる。
 [第1のロボット]
 第1のロボット10は、作業台50の中心に配置され、Z軸周りに回転可能に構成される。また、第1のロボット10は、作業台50の開口部50aから上方に突き出るように第1の架台540の第1の上端部540Tに設置される。これにより、第1のロボット10は作業台50(回転テーブル部53)上の複数の作業領域P1~P8の全てにアクセスすることができる。
 また、第1のロボット10は、図5に示すように、多関節アーム11と、多関節アーム11の先端部に接続されたハンド部12と、多関節アーム11の基端部に接続された駆動ユニット13とを有する。
 多関節アーム11は、例えば垂直多関節アームで構成されるが、これに限られず、水平多関節型(SCARA(Selective Compliance Assembly Robot Arm)型とも言う。)、フログレグ(frog leg)型、パラレルリンク型等の他の形式の多関節アームで構成されてもよい。
 駆動ユニット13は、多関節アーム11と第1の架台540の第2のベースフレーム542との間に固定され、コントローラ80から送信される制御指令に基づいて多関節アーム11及びハンド部12を駆動する。コントローラ80は、多関節アーム11の伸縮、Z軸まわりの旋回及びハンド部12の回転等の動作を制御する。典型的には、コントローラ80は、当該コントローラのメモリに格納されたプログラムを実行することで、第1のロボット10を所定のシーケンスで動作させる。
 [第2のロボット]
 第2のロボット20は、Z軸周りに回転可能に構成され、作業台50の外側で複数の作業領域P1~P8のうち少なくとも1つの作業領域にアクセス可能な位置に配置される。
 また、第2のロボット20は、典型的には第1のロボット10と同様の構成とすることができるがこれに限定されるものではない。なお、第2のロボット20の構成は組立装置200の構成に応じて適宜変更されてもよい。
 [コントローラ]
 第1及び第2のロボット10,20の動作、回転テーブル部53の回転動作などは、コントローラ80によって制御される。コントローラ80は、典型的にはコンピュータで構成される。コントローラ80は、搬送ライン100の動作を制御するように構成されてもよい。また、コントローラ80は、組立装置200の一部として構成されてもよいし、組立装置200とは別の制御装置で構成されてもよい。
 [その他]
 本実施形態に係る組立装置200は、図1に示すように、第3のロボット(C)としての第3のロボット30と、第1乃至第3の部品収納部40a~40cと、部品支持台70と、ワークWの組立を補助する第1乃至第3の補助装置60a~60cを有する構成とすることができる。
 第3のロボット30は、同図に示すように、作業台50の外側で作業台50と搬送ライン100に近接した位置に配置され、第1の搬送コンベヤ101から作業台50への組立前のワークW1を搬送し、作業台50から第2の搬送コンベヤ102へ組立後のワークW2を搬送可能に構成される。
 第1の部品収納部40aは、図1に示すように、作業台50の外側で作業領域P4近傍の位置に配置される。本実施形態では、第1の部品収納部40aにはワークWに取り付けられる部品Aが載置されている。
 第2及び第3の部品収納部40b,40cは、図1に示すように、作業外50の外側で第2のロボット20がアクセス可能な位置に配置される。本実施形態では、第2の部品収納部40bには部品Bが載置されていて、第3の部品収納部40cには部品Cが載置されている。
 第1乃至第3の部品収納部40a~40cは、特に限定されないが、典型的にはワークWに取り付けられる部品を載置可能なストッカー等の部品棚である。
 部品支持台70は、図1に示すように、作業台50の外側で作業領域P6近傍の位置に配置され、第3の補助装置60cの鉛直上方に設けられる。本実施形態では、部品支持台70は、部品Bを支持可能に構成される。
 ここで、部品支持台70が配置される位置は、同図に示すように第1のロボット10と第2の部品収納部40bとの間に配置され、部品Bが第2のロボット20から第1のロボットへ間接的に渡される中継位置となる。なお、本実施形態に係る部品支持台70は、部品Bを支持可能な支持台(載置台)等であれば特に限定されるものではない。
 第1の補助装置60aは、図1に示すように、作業台50の外側で作業領域P3近傍の位置に配置され、部品Aが組み付けられたワークWをネジ締め可能に構成される。
 第2の補助装置60bは、同1に示すように、作業台50の外側で作業領域P5近傍の位置に配置され、部品Aと部品Bが組み付けられたワークWをネジ締め可能に構成される。
 第3の補助装置60c、図1に示すように、作業台50の外側で作業領域P6近傍の位置に配置される。本実施形態では、第3の補助装置60cは、部品Aと部品Bが取り付けられ、ネジ締めされたワークWの表裏を反転させるように構成された反転装置である。
 <組立装置の動作>
 次に、組立装置200の動作について説明する。図7は組立装置200よるワークW1の搬入からワークW2の搬出までの工程を示すフロー図である。
 組立装置200は、作業テーブル51の回転テーブル部53を所定時間毎に等角度ピッチで回転させながら各回転位置において組立前のワークW1の搬入と、ワークWの組立動作と、組立後のワークW2の搬出を実行する。組立装置200の動作は、コントローラ80により制御される。
 図1に示すように、組立装置200は、複数の作業領域P1~P8を有する。作業領域P1は、組立前のワークW1が搬入される領域を兼ねる。本実施形態では第3のロボット30が搬送ライン100(第1の搬送コンベヤ101)から作業領域P1へ組立前のワークW1を搬入する(St101)。次に、第1のロボット10は、部品Aが予め載置されている第1の部品収納部40aから部品Aをピックアップする(St102)。そして、ワークW1が作業領域P1へ搬入されてから一定時間(時間T1)経過後、回転テーブル部53が時計周りに1ピッチ(45°)回転し、ワークW1が作業領域P2へ搬送される。
 続いて、作業領域P2において、第1のロボット10が作業領域P1から搬送されてきたワークW1に部品Aを組み付ける(St103)。そして、ワークW1が作業領域P2へ搬送されてから一定時間(時間T1)経過後、回転テーブル部53が時計周りに1ピッチ(45°)回転し、部品Aが組み付けられたワークWが作業領域P2からP3へ搬送される。
 続いて、作業領域P3において、作業領域P2から搬送されてきた部品Aが組み付けられたワークWのネジ締めが第1の補助装置60aにより行われる(St104)。次に、第2のロボット20が、部品Bが予め載置されている第2の部品収納部40bから部品Bをピックアップし(St105)、部品支持台70へ部品Bを移載する(St106)。そして第1のロボット10が部品支持台70から部品Bをピックアップする(St107)。次いで、部品Aが組み付けられたワークWが作業領域P3へ搬送されてから一定時間(時間T1)経過後、回転テーブル部53が時計周りに1ピッチ(45°)回転し、当該ワークWが作業領域P3からP4へ搬送される。
 続いて、作業領域P4において、第1のロボット10が作業領域P3から搬送されてきた上記ワークWに部品Bを組み付ける(St108)。そして、上記ワークWが作業領域P4へ搬送されてから一定時間(時間T1)経過後、回転テーブル部53が時計周りに1ピッチ(45°)回転し、部品Aと部品Bが組み付けられたワークWが作業領域P4からP5へ搬送される。
 続いて、作業領域P5において、作業領域P4から搬送されてきた上記ワークWのネジ締めが第2の補助装置60bにより行われる(St109)。そして、上記ワークWが作業領域P3へ搬送されてから一定時間(時間T1)経過後、回転テーブル部53が時計周りに1ピッチ(45°)回転し、部品Aと部品Bが組み付けられ、ネジ締めされたワークWが作業領域P5からP6へ搬送される。
 続いて、作業領域P6において、第3の補助装置60cにより作業領域P5から搬送されてきた上記ワークWの表裏が反転される(St110)。次に、第2のロボット20は、部品Cが予め載置されている第3の部品収納部40cから部品Cをピックアップする(St111)。そして、上記ワークWが作業領域P6へ搬送されてから一定時間(時間T1)経過後、回転テーブル部53が時計周りに1ピッチ(45°)回転することにより、上記ワークWは表裏が反転した状態で作業領域P7へ搬送される。
 続いて、作業領域P7において、第2のロボット20が作業領域P6から搬送されてきた上記ワークWに部品A及び部品Bが組み付けられた側と反対側から部品Cを組み付けることにより(St112)、ワークW2が組み立てられる。そして、上記ワークWが作業領域P7へ搬送されてから一定時間(時間T1)経過後、回転テーブル部53が時計周りに1ピッチ(45°)回転し、ワークW2が作業領域P7からP8へ搬送される。
 続いて、作業領域P8へ搬送されたワークW2が第3のロボット30により搬送ライン100(第2の搬送コンベヤ102)へ搬出される(St113)。作業領域P8は、組立後のワークW2が搬出される領域を兼ねる。そして、ワークW2が作業領域P8へ搬送されてから一定時間(時間T1)経過後、回転テーブル部53が時計周りに1ピッチ(45°)回転し、再度第3のロボット30により搬送ライン100(第1の搬送コンベヤ101)から作業領域P1へ組立前のワークW1が搬入される。
 組立装置200は、典型的には、上記工程(St101~St113)を繰り返し実行することで、ワークWを作業領域P1から作業領域P8へ順次搬送し、各作業領域で所定の組立作業を実施する。
 以上のようにして、ワークW1からワークW2が組み立てられるまでの組立装置200による組立作業が行われる。コントローラ80は、回転テーブル部53、第1及び第2のロボット10,20等の駆動を制御することで、装置全体を所定のサイクルタイムで稼働させる。
 なお、本実施形態に係る組立装置200は、典型的には作業領域P1へ搬入されたワークW1が次の作業領域P2へ搬送された後、順次作業領域P1へ新たなワークW1が搬入される。
 一般に、複数台のロボットを有するロボット装置で電子機器や電子部品の製造ラインにおけるワークの組立及び搬送工程が分担される場合、当該装置のサイクルタイムは、最も時間を要するワークの組立作業のサイクルタイムに依存する。それ以外の作業に要する時間がどんなに短くても、装置全体のサイクルタイムを最長の組立作業のサイクルタイムより短くすることはできない。
 そこで、本実施形態の組立装置200は、具体的には以下のようにして上記問題を解決するようにしている。
 図8は、第1及び第2のロボット10,20のシーケンス動作の経時的な流れを示す図である。ここでは、回転テーブル部53が1ピッチ回転した後、複数の作業領域P2~P8にワークWが載置された状態となった直後からの組立装置200の動作を例に挙げて説明する。
 図8に示すように、組立前のワークW1が回転テーブル部53の作業領域P1に搬入され、第1のロボット10が第1の部品収納部40aから部品Aをピックアップしている間に、第2のロボット20は第2の部品収納部40bから部品Bをピックアップする。
 次いで、図8に示すように、第2のロボット20が第2の部品収納部40bからピックアップした部品Bを部品支持台70へ移載する間に、第1のロボット10は、作業領域P2にて、部品AをワークW1に組み付ける。
 そして、第1のロボット10がワークW1に対する部品Aの組み付け作業と、第2のロボット20により第2の部品収納部40bから部品支持台70へ移載された部品Bをピックアップする間に、第2のロボット20は第3の部品収納部40cから部品Cをピックアップする。
 続いて、第1のロボット10が部品支持台70からピックアップした部品Bを作業領域P4にてワークWに組み付けている間に、第2のロボット20は第3の部品収納部40cからピックアップした部品Cを作業領域P7でワークWに組み付ける。
 このように、本実施形態では、図8に示すように、回転テーブル部53が所定角度ピッチ(45°)回転する前(回転テーブル部53が静止している間(時間T1))に、第1及び第2のロボット10,20による部品のピックアップ及びワークWに対する組み付け作業が並行して行われる。
 また、本実施形態では第1及び第2のロボット10,20が駆動している間に、時間T1以内で、第3のロボット30のワーク(W1,W2)の搬入/搬出と、第1及び第2の補助装置60a,60bのネジ締めと、第3の補助装置60cの反転動作が上記動作と並行して行われる。なお、第1乃至第3のロボット10~30は、回転テーブル部53が回転している間(図8(T2))に駆動することもできる。
 従って、本実施形態においては、第1及び第2のロボット10,20と、第1乃至第3の補助装置60a~60cによるワークWの組立作業が各作業領域において並行して行われる。これにより、装置全体のサイクルタイムが最も時間のかかるワークWの組立作業に左右されることがなくなる。
 つまり、これまでの技術であれば、ワークWの組立作業は、複数の作業領域の全てにアクセス可能な第1のロボット10が主に行うことになるため、長大なサイクルタイムを有してしまう。
 そこで、本実施形態の組立装置200は、本来ならば第1のロボット10により主に実施されるワークWの組立作業が、第2のロボット20と複数台の補助装置により補助されることにより、ワークが搬入/搬出されるまでのサイクルタイム(時間T1)がこれまでの技術よりも短縮される。
 従って、本実施形態によれば、組立装置200のサイクルタイムの短縮を図ることができるため、電子機器や電子部品を製造する上で、生産性の更なる向上を実現することができる。なお、本実施形態において時間T1は、約40秒とされるが、勿論これに限られない。
 また本実施形態によれば、第1のロボット10は、回転テーブル部53の中心に形成された開口部50a内に設置されているため、第1のロボット10は各作業領域P1~P8に対してそれぞれ等距離に位置することになる。これにより、第1のロボット10は複数の作業領域にアクセスすることができることから、ワークWを組立てる上で複数のロボットを余分に設ける必要がなくなり、装置全体のコンパクト化を図ることができる。
 (第2の実施形態)
 次に、本技術に係る組立装置の第2の実施形態について説明する。以下、第1の実施形態と同様の構成については同様の符号を付し、説明を省略又は簡略化する。
 本実施形態に係る組立装置は、作業台50と、第1及び第2のロボット10,20と、コントローラとを有する。また、本実施形態においても組立装置は、上述の第1の実施形態と同様に、第1乃至第3の部品収納部40a~40cと、第1乃至第3の補助装置60a~60cと、部品支持台70とを有する。
 作業台50、第1乃至第2のロボット10,20、第1乃至第3の補助装置60a~60c、第1乃至第3の部品収納部40a~40c及び部品支持台70は、第1の実施形態と同様の構成を有するが、本実施形態のコントローラは、第1の実施形態のコントローラ80と比較して、以下の点で異なる制御を実行する。
 即ち第1の実施形態では、コントローラ80は、第1のロボット10のワークWの組立作業を補助するように、第2のロボット20等の動作を制御する。これに対し、本実施形態におけるコントローラは、さらに、ワークWの組立作業が複数の作業領域上で分担されるように第1及び第2のロボット10,20等の動作を制御する。
 例えば、本実施形態のコントローラは、所定の作業領域における第1のロボット10の組立時間等から、第1のロボット10が所定の複数の作業領域上での組立作業を一定時間(時間T1)以内に遂行可能か否かを判定し、遂行不可能と判断したときは、第1のロボット10の代わりに、第2のロボット20に第1のロボット10が所定の作業領域で行う予定であった組立作業を実行させることができる。
 これにより、例えば第1のロボット10による所定の作業領域上での組立作業(例えば、図7(St103))が目標とするタクトタイムを超えた場合に、本実施形態のコントローラは第1のロボット10が行う予定であったその後の組立作業(例えば、図7(St108))を第2のロボット20により実行させることができる。従って、ワークWの組立を時間T1以内に遂行することが可能となる。
 また、本実施形態に係る組立装置は、コントローラが第2のロボット20の動作時間等を用いて上記と同様な判定をすることにより、ワークWの組立作業を第1のロボット10と第2のロボット20で分担することもできる。
 例えば本実施形態の組立装置は、第2のロボット20の動作(例えば、図7(St105又はSt106))が目標とするタクトタイムを超えた場合に、第2のロボット20が行う予定であったその後の組立作業(例えば、図7(St111及びSt112))を第2のロボット20に代わって第1のロボット10に行わせることもできる。これにより、上記と同様にワークWの組立を時間T1以内に遂行することが可能となる。
 以上のことから、本実施形態の組立装置は、ワークWの組立作業を第1及び第2のロボット10,20で分担することができる。これにより、ワークW1の搬入からワークW2の搬出までのサイクルタイム(時間T1)が、目標とするサイクルタイムに収められ、装置全体のサイクルタイムの長時間化が抑制される。従って、上述の第1の実施形態と同等の生産性を維持することが可能となる。
 [変形例]
 以上、本技術の実施形態について説明したが、本技術は上述の実施形態に限定されるものではなく、本技術の要旨を逸脱しない範囲内において種々変更を加え得ることは勿論である。
 また以上の実施形態では、第2の架台550は第1の架台540を囲むように配置されたが、両架台のレイアウトは特に限定されない。架台の数も2台に限られず、3台以上の架台が連結フレームを介して連結された種々の架台構造について本技術は適用可能である。
 さらに、ワークWは回転テーブル部53によって搬送される例に限られず、作業台50の中心に配置された第1のロボット10によって搬送されてもよい。
 さらに以上の実施形態では、組立装置は、回転インデックステーブルを用いてワークWを円周に沿って所定角度ピッチで搬送するように構成される。ここで、本技術では上記円周は真円の円周に限られず、例えば、半円、楕円、円弧又は曲率が0に近い円等の周囲であってもよい。
 さらに以上の実施形態では、複数の作業領域上の各々のワークに対してそれぞれ単一の組立作業が行われたが、これに限られず、2種以上の組立作業がおこなわれてもよい。
 さらに以上の実施形態では、第1又は第2のロボット10,20のうち一方のロボットの組立作業を他方のロボットに行わせることが可能な構成であるが、これに限られず、本技術に係るコントローラは、補助装置による所定の組立作業を第1又は第2のロボット10,20に実行させてもよい。
 なお、本技術は以下のような構成もとることができる。
 (1)
 複数のワークが載置される載置面を有し、円周に沿って配列された複数の作業領域へ前記複数のワークを個々に一定時間毎に巡回させる作業台と、
 前記円周の内側に配置され、前記複数の作業領域にアクセス可能な第1のロボットと、
 前記円周の外側に配置され、前記複数の作業領域のうち少なくとも1つの作業領域にアクセス可能な第2のロボットと、
 前記複数の作業領域のうち所定の複数の作業領域上のワーク各々に対して前記一定時間内における所定の処理を前記第1のロボットに実行させ、前記所定の複数の作業領域のうち少なくとも1つの作業領域上の前記ワークに対する前記第1のロボットの処理を補助する動作を前記第2のロボットに実行させるように構成されたコントローラと
 を具備する組立装置。
 (2)
 上記(1)に記載の組立装置であって、
 第1の部品を収納する部品収納部をさらに具備し、
 上記所定の複数の作業領域は、上記ワークに上記第1の部品が組み付けられる第1の組立領域を含み、
 上記コントローラは、上記第1のロボットと上記部品収納部との間に設定された中継位置へ上記第1の部品を上記部品収納部から搬送する動作を上記第2のロボットに実行させ、上記中継位置に搬送された上記第1の部品を取得し上記第1の組立領域で上記ワークに組み付ける動作を上記第1のロボットに実行させる
 組立装置。
 (3)
 上記(2)に記載の組立装置であって、
 上記中継位置に配置され、上記第1の部品を支持可能な部品支持台をさらに具備する
 組立装置。
 (4)
 上記(1)~(3)のいずれか1つに記載の組立装置であって、
 上記所定の複数の作業領域は、上記ワークに第2の部品が組み付けられる第2の組立領域を含み、
 上記コントローラは、上記第2の組立領域で上記第2の部品を上記ワークに組み付ける動作を上記第2のロボットに実行させる
 組立装置。
 (5)
 上記(1)~(4)のいずれか1つに記載の組立装置であって、
 上記コントローラは、上記所定の複数の作業領域上のワーク各々に対する上記第1のロボットによる所定の処理が上記一定時間内に遂行可能か否かを判定し、遂行不可能と判断したときは、上記第1のロボットに代わって上記第2のロボットに上記所定の処理を実行させる
 組立装置。
 (6)
 上記(1)~(5)のいずれか1つに記載の組立装置であって、
 上記円周の外側に配置され、上記所定の複数の作業領域とは異なる作業領域上の上記ワークに対して所定の処理を上記一定時間以内に実行する補助装置をさらに具備する
 組立装置。
 (7)
 上記(1)~(6)のいずれか1つに記載の組立装置であって、
 上記作業台は、上記一定時間毎に所定角度ずつ回転する回転テーブルで構成され、
 上記第1のロボットは、上記回転テーブルとは非接触で上記回転テーブルの中心部に設置される
 組立装置。
 (8)
 上記(7)に記載の組立装置であって、
 上記第1のロボットを支持する第1の架台と、上記第1の架台とは独立した第2の架台とを有する架台ユニットをさらに具備する
 組立装置。
 (9)
 複数のワークが載置される載置面を有し、円周に沿って配列された複数の作業領域へ上記複数のワークを個々に一定時間毎に巡回させる作業台と、
 上記円周の内側に配置され、上記複数の作業領域にアクセス可能な第1のロボットと、
 上記円周の外側に配置され、上記複数の作業領域のうち少なくとも1つの作業領域にアクセス可能な第2のロボットと、
 上記複数の作業領域のうちの所定の複数の作業領域上のワークに対して上記一定時間内に上記第1のロボットおよび上記第2のロボットにより所定の処理を実行させるコントローラと、
 を具備する組立装置。
 (10)
 円周に沿って配列された複数の作業領域へ複数のワークを個々に一定時間毎に巡回させ、
 上記円周の内側に配置された第1のロボットに、上記一定時間内に、上記複数の作業領域のうち所定の複数の作業領域上のワーク各々に対する所定の処理を実行させ、
 上記円周の外側に配置された第2のロボットに、上記所定の複数の作業領域のうち少なくとも1つの作業領域上の上記ワークに対する上記第1のロボットの処理を補助する動作を実行させる
 組立装置の制御方法。
 1・・・・生産システム
 10・・・第1のロボット
 20・・・第2のロボット
 30・・・第3のロボット
 40a・・第1の部品収納部
 40b・・第2の部品収納部
 40c・・第3の部品収納部
 50・・・作業台
 53・・・回転テーブル部
 54・・・架台ユニット
 60a・・第1の補助装置
 60b・・第2の補助装置
 60c・・第3の補助装置
 70・・・部品支持台
 80・・・コントローラ
 100・・搬送ライン
 200・・組立装置

Claims (10)

  1.  複数のワークが載置される載置面を有し、円周に沿って配列された複数の作業領域へ前記複数のワークを個々に一定時間毎に巡回させる作業台と、
     前記円周の内側に配置され、前記複数の作業領域にアクセス可能な第1のロボットと、
     前記円周の外側に配置され、前記複数の作業領域のうち少なくとも1つの作業領域にアクセス可能な第2のロボットと、
     前記複数の作業領域のうち所定の複数の作業領域上のワーク各々に対して前記一定時間内における所定の処理を前記第1のロボットに実行させ、前記所定の複数の作業領域のうち少なくとも1つの作業領域上の前記ワークに対する前記第1のロボットの処理を補助する動作を前記第2のロボットに実行させるように構成されたコントローラと
     を具備する組立装置。
  2.  請求項1に記載の組立装置であって、
     第1の部品を収納する部品収納部をさらに具備し、
     前記所定の複数の作業領域は、前記ワークに前記第1の部品が組み付けられる第1の組立領域を含み、
     前記コントローラは、前記第1のロボットと前記部品収納部との間に設定された中継位置へ前記第1の部品を前記部品収納部から搬送する動作を前記第2のロボットに実行させ、前記中継位置に搬送された前記第1の部品を取得し前記第1の組立領域で前記ワークに組み付ける動作を前記第1のロボットに実行させる
     組立装置。
  3.  請求項2に記載の組立装置であって、
     前記中継位置に配置され、前記第1の部品を支持可能な部品支持台をさらに具備する
     組立装置。
  4.  請求項1に記載の組立装置であって、
     前記所定の複数の作業領域は、前記ワークに第2の部品が組み付けられる第2の組立領域を含み、
     前記コントローラは、前記第2の組立領域で前記第2の部品を前記ワークに組み付ける動作を前記第2のロボットに実行させる
     組立装置。
  5.  請求項1に記載の組立装置であって、
     前記コントローラは、前記所定の複数の作業領域上のワーク各々に対する前記第1のロボットによる所定の処理が前記一定時間内に遂行可能か否かを判定し、遂行不可能と判断したときは、前記第1のロボットに代わって前記第2のロボットに前記所定の処理を実行させる
     組立装置。
  6.  請求項1に記載の組立装置であって、
     前記円周の外側に配置され、前記所定の複数の作業領域とは異なる作業領域上の前記ワークに対して所定の処理を前記一定時間以内に実行する補助装置をさらに具備する
     組立装置。
  7.  請求項1に記載の組立装置であって、
     前記作業台は、前記一定時間毎に所定角度ずつ回転する回転テーブルで構成され、
     前記第1のロボットは、前記回転テーブルとは非接触で前記回転テーブルの中心部に設置される
     組立装置。
  8.  請求項7に記載の組立装置であって、
     前記第1のロボットを支持する第1の架台と、前記第1の架台とは独立した第2の架台とを有する架台ユニットをさらに具備する
     組立装置。
  9.  複数のワークが載置される載置面を有し、円周に沿って配列された複数の作業領域へ前記複数のワークを個々に一定時間毎に巡回させる作業台と、
     前記円周の内側に配置され、前記複数の作業領域にアクセス可能な第1のロボットと、
     前記円周の外側に配置され、前記複数の作業領域のうち少なくとも1つの作業領域にアクセス可能な第2のロボットと、
     前記複数の作業領域のうちの所定の複数の作業領域上のワークに対して前記一定時間内に前記第1のロボットおよび前記第2のロボットにより所定の処理を実行させるコントローラと、
     を具備する組立装置。
  10.  円周に沿って配列された複数の作業領域へ複数のワークを個々に一定時間毎に巡回させ、
     前記円周の内側に配置された第1のロボットに、前記一定時間内に、前記複数の作業領域のうち所定の複数の作業領域上のワーク各々に対する所定の処理を実行させ、
     前記円周の外側に配置された第2のロボットに、前記所定の複数の作業領域のうち少なくとも1つの作業領域上の前記ワークに対する前記第1のロボットの処理を補助する動作を実行させる
     組立装置の制御方法。
PCT/JP2016/005001 2015-12-10 2016-11-29 組立装置及びその制御方法 Ceased WO2017098699A1 (ja)

Priority Applications (3)

Application Number Priority Date Filing Date Title
EP16872601.6A EP3388190A4 (en) 2015-12-10 2016-11-29 Assembly device and control method thereof
CN201680070671.2A CN108367401B (zh) 2015-12-10 2016-11-29 组装设备及其控制方法
US15/780,863 US10611027B2 (en) 2015-12-10 2016-11-29 Assembly apparatus and control method therefor

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2015-241069 2015-12-10
JP2015241069A JP2017104945A (ja) 2015-12-10 2015-12-10 組立装置及びその制御方法

Publications (1)

Publication Number Publication Date
WO2017098699A1 true WO2017098699A1 (ja) 2017-06-15

Family

ID=59013616

Family Applications (1)

Application Number Title Priority Date Filing Date
PCT/JP2016/005001 Ceased WO2017098699A1 (ja) 2015-12-10 2016-11-29 組立装置及びその制御方法

Country Status (5)

Country Link
US (1) US10611027B2 (ja)
EP (1) EP3388190A4 (ja)
JP (1) JP2017104945A (ja)
CN (1) CN108367401B (ja)
WO (1) WO2017098699A1 (ja)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US12188932B2 (en) 2018-09-14 2025-01-07 Immatics Biotechnologies Gmbh Method for high throughput peptide-MHC affinity screening for TCR ligands

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102018122499A1 (de) 2018-09-14 2020-03-19 HELLA GmbH & Co. KGaA Einrichtung mit einem ersten und einem zweiten Roboter und Verfahren zu deren Betrieb
CN109014908B (zh) * 2018-09-20 2024-03-22 山东红宝自动化有限公司 一种电器盒装配线
JP7376319B2 (ja) * 2019-10-31 2023-11-08 矢崎総業株式会社 ワークピッキング装置
EP4026662A1 (en) * 2021-01-11 2022-07-13 Robotautomation Svenska AB Object transfer device and a robot system including the object transfer device
JP2022131673A (ja) * 2021-02-26 2022-09-07 日本電産サンキョー株式会社 処理システム
CN113732693B (zh) * 2021-09-14 2022-10-21 潍坊路加精工有限公司 一种变间距产品承载装置及转盘组装设备
CN114029947B (zh) * 2021-10-27 2022-11-18 因格(苏州)智能技术有限公司 机器人拾物序列确定方法与装置
KR102458851B1 (ko) * 2022-05-04 2022-10-27 주식회사 디에이치 기어 조립 자동화 시스템
CN114871855B (zh) * 2022-05-20 2024-03-08 广汽本田汽车有限公司 一种发动机盖生产线
CN114986154A (zh) * 2022-07-05 2022-09-02 青岛大学附属医院 一种内科护理用病房护理设备制造用的自动化装配设备

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58150436U (ja) * 1982-03-31 1983-10-08 ぺんてる株式会社 間歇回転テ−ブル型組立装置
JPS59110523A (ja) * 1982-12-17 1984-06-26 Matsushita Electric Ind Co Ltd 自動組立センタ
JPS6029285A (ja) * 1983-07-29 1985-02-14 シ−ケ−ディ株式会社 ロボットによる組立方法
JPH05138465A (ja) * 1991-11-25 1993-06-01 Canon Inc 部品供給取出方法
JPH06226568A (ja) * 1993-02-05 1994-08-16 Matsushita Electric Ind Co Ltd 複腕ロボットによる部品組立装置
WO2009098285A1 (de) * 2008-02-07 2009-08-13 Edag Gmbh & Co. Kgaa Drehtisch
JP2010234456A (ja) * 2009-03-30 2010-10-21 Toyota Motor Corp 組付装置及び組付方法
JP5682721B1 (ja) * 2014-03-31 2015-03-11 ソニー株式会社 産業用ロボットおよびその架台ユニット

Family Cites Families (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58150436A (ja) 1982-03-04 1983-09-07 Mitsui Toatsu Chem Inc 排ガス浄化用触媒およびその製造法
JPS5973246A (ja) 1982-10-18 1984-04-25 Matsushita Electric Ind Co Ltd 部品供給装置
JPS59110523U (ja) * 1983-01-18 1984-07-25 大和精工株式会社 育苗用播種装置におけるユニツト接続装置
US4611749A (en) * 1983-11-28 1986-09-16 Mazda Motor Corporation Method of and system for assembling a plurality of parts into a unit
US4890241A (en) * 1987-10-26 1989-12-26 Megamation Incorporated Robotic system
JPH0815877B2 (ja) * 1987-12-10 1996-02-21 日産自動車株式会社 自動車車体の組立方法
US4998050A (en) * 1988-06-13 1991-03-05 Nissan Motor Co., Ltd. System and method for teaching robots
US4928383A (en) * 1988-10-18 1990-05-29 Permaflex Company Non-synchronous assembly system
GB2234478B (en) * 1989-07-25 1993-12-01 Honda Motor Co Ltd Method of and apparatus for emergency shutdown of production line
JP2917376B2 (ja) * 1990-03-22 1999-07-12 トヨタ自動車株式会社 自動車ドアの自動装着装置
DE4113556C3 (de) * 1990-04-26 2000-02-24 Mazda Motor Produktionseinrichtung zum Steuern von Produktionsvorgängen und Produktionssteuerverfahren für Produktionsvorgänge
US5272805A (en) * 1991-04-01 1993-12-28 Fanuc Robotics North America, Inc. System for the flexible assembly of assemblies
JP2001347428A (ja) * 2000-06-06 2001-12-18 Hitachi Ltd ケーブル組立装置
JP2003062727A (ja) * 2001-04-26 2003-03-05 Fuji Photo Film Co Ltd 組立装置
DE20211755U1 (de) * 2002-07-30 2003-12-18 Kuka Schweissanlagen Gmbh Bearbeitungsanlage
DE102006030427B3 (de) * 2006-06-29 2008-01-17 Thyssenkrupp Drauz Nothelfer Gmbh Multiflexible Fertigungsanlage für aus mehreren Bauteilen zu fügende Zusammenbauten von Kraftfahrzeug-Karosserien
US8157155B2 (en) * 2008-04-03 2012-04-17 Caterpillar Inc. Automated assembly and welding of structures
JP5349134B2 (ja) * 2009-05-21 2013-11-20 本田技研工業株式会社 圧入方法及び圧入装置
JP5423441B2 (ja) * 2010-02-03 2014-02-19 株式会社安川電機 作業システム、ロボット装置、機械製品の製造方法
CN201940589U (zh) * 2010-12-28 2011-08-24 浙江精一重工有限公司 摩托车减震筒坯件浇注生产线
JP5454491B2 (ja) * 2011-02-25 2014-03-26 株式会社安川電機 作業システム
JP2012081582A (ja) * 2012-01-16 2012-04-26 Seiko Epson Corp 生産システム用汎用セル及び該汎用セルを用いた生産システム
US20130245823A1 (en) * 2012-03-19 2013-09-19 Kabushiki Kaisha Yaskawa Denki Robot system, robot hand, and robot system operating method
CN104070350A (zh) * 2013-03-28 2014-10-01 爱司帝光电科技(苏州)有限公司 组装设备与组装方法
CN203471310U (zh) * 2013-08-01 2014-03-12 上海爱德夏机械有限公司 一种转盘式汽车门铰链总成的自动装配装置
DE202013103555U1 (de) * 2013-08-07 2014-11-13 Kuka Systems Gmbh Logistiksystem
JP5696806B1 (ja) * 2014-03-31 2015-04-08 ソニー株式会社 産業用ロボット
DE202014101987U1 (de) * 2014-04-28 2015-07-30 Kuka Systems Gmbh Bearbeitungsstation
US10691110B2 (en) * 2014-08-08 2020-06-23 Sony Corporation Transfer apparatus
CN204123079U (zh) * 2014-09-24 2015-01-28 中山市恒鑫聚诚工业设备有限公司 一种用机器人自动装配马达生产线
CN104440087A (zh) * 2014-12-01 2015-03-25 周俊雄 一种触摸笔零部件全自动组装设备
CN204504730U (zh) * 2015-02-03 2015-07-29 王祥 空气净化滤芯快速装配设备
CN105127739B (zh) * 2015-09-03 2017-12-01 慈溪市益达电器有限公司 一种离合器自组装系统及其组装方法
WO2017084699A1 (en) * 2015-11-17 2017-05-26 Abb Schweiz Ag A method for optimizing a work cycle in a robot system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58150436U (ja) * 1982-03-31 1983-10-08 ぺんてる株式会社 間歇回転テ−ブル型組立装置
JPS59110523A (ja) * 1982-12-17 1984-06-26 Matsushita Electric Ind Co Ltd 自動組立センタ
JPS6029285A (ja) * 1983-07-29 1985-02-14 シ−ケ−ディ株式会社 ロボットによる組立方法
JPH05138465A (ja) * 1991-11-25 1993-06-01 Canon Inc 部品供給取出方法
JPH06226568A (ja) * 1993-02-05 1994-08-16 Matsushita Electric Ind Co Ltd 複腕ロボットによる部品組立装置
WO2009098285A1 (de) * 2008-02-07 2009-08-13 Edag Gmbh & Co. Kgaa Drehtisch
JP2010234456A (ja) * 2009-03-30 2010-10-21 Toyota Motor Corp 組付装置及び組付方法
JP5682721B1 (ja) * 2014-03-31 2015-03-11 ソニー株式会社 産業用ロボットおよびその架台ユニット

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See also references of EP3388190A4 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US12188932B2 (en) 2018-09-14 2025-01-07 Immatics Biotechnologies Gmbh Method for high throughput peptide-MHC affinity screening for TCR ligands

Also Published As

Publication number Publication date
EP3388190A1 (en) 2018-10-17
US20180272533A1 (en) 2018-09-27
US10611027B2 (en) 2020-04-07
CN108367401A (zh) 2018-08-03
EP3388190A4 (en) 2018-12-12
CN108367401B (zh) 2021-02-02
JP2017104945A (ja) 2017-06-15

Similar Documents

Publication Publication Date Title
WO2017098699A1 (ja) 組立装置及びその制御方法
KR101039778B1 (ko) 다면 부품 유지부를 가진 워크스테이션 및 그러한 스테이션의 제어 방법
JP6231094B2 (ja) 電子機器組立機および類似の組立機
JP5696806B1 (ja) 産業用ロボット
US6036082A (en) Welding station
JP2008213129A (ja) 生産システム用汎用セル及び該汎用セルを用いた生産システム
KR20130142915A (ko) 로봇 핸드
JP5751197B2 (ja) 被加工物支持装置及び工作機械
JP4946523B2 (ja) 生産システム用汎用セル及び該汎用セルを用いた生産システム
JP5682721B1 (ja) 産業用ロボットおよびその架台ユニット
TW201617192A (zh) 機器人及機器人系統
JP4595053B2 (ja) 多関節型ロボット
JP6314506B2 (ja) 車両部品の製造装置及び製造方法
US6921011B1 (en) Work piece holder having top mounted robot and method of use
KR20180009789A (ko) 워크 위치 결정장치
JP2008213130A (ja) 生産システム用汎用セル及び該汎用セルを用いた生産システム
JP3308625B2 (ja) 溶接ライン
JP5480953B1 (ja) 溶接装置
JPS59110523A (ja) 自動組立センタ
JPH1177361A (ja) レーザ加工方法及びレーザ加工装置
JP2012081582A (ja) 生産システム用汎用セル及び該汎用セルを用いた生産システム
KR20200061059A (ko) 초정밀 소형 병렬 로봇 매니퓰레이터
JP6685186B2 (ja) 基板搬送態様決定方法、基板搬送態様決定プログラム、部品実装機
JP7559286B2 (ja) 溶接自動化装置および溶接自動化方法
JP2024120369A (ja) 射出成形システムおよび、射出成形システムの制御方法

Legal Events

Date Code Title Description
121 Ep: the epo has been informed by wipo that ep was designated in this application

Ref document number: 16872601

Country of ref document: EP

Kind code of ref document: A1

WWE Wipo information: entry into national phase

Ref document number: 15780863

Country of ref document: US

NENP Non-entry into the national phase

Ref country code: DE

WWW Wipo information: withdrawn in national office

Ref document number: 2016872601

Country of ref document: EP