US20130286841A1 - Load Sharing Method, Device, and System - Google Patents
Load Sharing Method, Device, and System Download PDFInfo
- Publication number
- US20130286841A1 US20130286841A1 US13/932,992 US201313932992A US2013286841A1 US 20130286841 A1 US20130286841 A1 US 20130286841A1 US 201313932992 A US201313932992 A US 201313932992A US 2013286841 A1 US2013286841 A1 US 2013286841A1
- Authority
- US
- United States
- Prior art keywords
- base station
- load
- shared
- information
- sharing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Abandoned
Links
- 238000000034 method Methods 0.000 title claims abstract description 43
- 230000004044 response Effects 0.000 claims description 18
- 230000011664 signaling Effects 0.000 description 18
- 230000008569 process Effects 0.000 description 6
- 230000003993 interaction Effects 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 238000004891 communication Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000006855 networking Effects 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W28/00—Network traffic management; Network resource management
- H04W28/02—Traffic management, e.g. flow control or congestion control
- H04W28/08—Load balancing or load distribution
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W28/00—Network traffic management; Network resource management
- H04W28/02—Traffic management, e.g. flow control or congestion control
- H04W28/08—Load balancing or load distribution
- H04W28/086—Load balancing or load distribution among access entities
- H04W28/0861—Load balancing or load distribution among access entities between base stations
- H04W28/0862—Load balancing or load distribution among access entities between base stations of same hierarchy level
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W92/00—Interfaces specially adapted for wireless communication networks
- H04W92/16—Interfaces between hierarchically similar devices
- H04W92/20—Interfaces between hierarchically similar devices between access points
Definitions
- the present invention relates to the field of communication technologies, and in particular, to a load sharing method, device and system.
- Evolved universal mobile telecommunication system universal mobile telecommunication system, UMTS for short
- territorial radio Access network evolved universal mobile telecommunication system territorial radio access network, E-UTRAN for short
- EPC evolved packet core
- the E-UTRAN includes a base stationbase station.
- the load status between base stations can be communicated by exchanging signaling through interconnected X2 interfaces.
- Each base station serves a separate cell.
- Each base station is connected to mobility management entity (mobility management entity, MME for short) in the EPC through S1 interface.
- mobility management entity mobility management entity
- the inventor finds at least the following defects of the existing technology:
- the traffic volume of the cells served by each base station is different.
- An base station to which a cell with a light traffic volume belongs has a light load.
- An base station to which a cell with a heavy traffic volume belongs has a heavy load.
- a load sharing method, device and system are provided in embodiments of the present invention.
- a load sharing method includes obtaining a current load value, if the current load value exceeds a preset load threshold value, interacting with middle base stations built in an MME of a requesting base station through load state signaling, and selecting a sharing base station, transmitting information of a shared load that needs to be shared to the selected sharing base station, and sharing the shared load to the sharing base station according to baseband resource prepared based on information of the shared load.
- the load sharing method includes when a current load value of a requesting base station exceeds a preset load threshold value, receiving information of a shared load that needs to be shared sent by the requesting base station, and preparing baseband resource based on the information of the shared load for the requesting base station to share the shared load to a sharing base station.
- a load sharing device is provided in an embodiment of the present invention.
- the device includes a first obtaining unit, configured to obtain a current load value, a selecting unit, configured to: if the current load value exceeds a preset load threshold value, interact with middle base stations built in an MME of a requesting base station through load state signaling, and select a sharing base station, a processing unit, configured to transmit information of a shared load that needs to be shared to the selected sharing base station, and a sharing unit, configured to share the shared load to the sharing base station according to baseband resource prepared based on information of the shared load.
- the device includes a second obtaining unit, configured to: when a current load value of a requesting base station exceeds a preset load threshold value, receive information of a shared load that needs to be shared sent by the requesting base station, and a preparing unit, configured to prepare baseband resource based on the information of the shared load for the requesting base station to share the shared load to a sharing base station.
- a load sharing system is provided in an embodiment of the present invention.
- the system includes a requesting base station and a sharing base station, wherein the requesting base station is configured to: obtain a current load value; if the current load value exceeds a preset load threshold value, interact with middle base stations built in an MME of the requesting base station through load state signaling, and select the sharing base station; transmit information of a shared load that needs to be shared to the selected sharing base station; and share the shared load to the sharing base station according to baseband resource prepared based on information of the shared load, and the sharing base station is configured to obtain the information of the shared load that needs to be shared sent by the requesting base station and prepare baseband resource based on the information of the shared load.
- a sharing base station is selected from the middle base stations configured in the same MME to share the load to be shared.
- a terminal that shares services can use the radio frequency resource of a heavy-load base station, that is, the requesting base station, and uses the baseband resource of other light-load base station, that is, the sharing base station, thereby balancing the load among base stations, improving the usage rate of radio baseband resource, fully using different devices of the operator, and saving the cost.
- FIG. 1 shows a process of a load sharing method provided in a first embodiment of the present invention
- FIG. 2 shows a process of a load sharing method provided in a second embodiment of the present invention
- FIG. 3 shows a process of a load sharing method provided in a third embodiment of the present invention
- FIG. 4 shows a structure of a load sharing device provided in a fourth embodiment of the present invention.
- FIG. 5 shows a structure of a load sharing device provided in a fifth embodiment of the present invention.
- FIG. 6 shows a structure of a load sharing system provided in a sixth embodiment of the present invention.
- FIG. 1 shows a process of a load sharing method provided in a first embodiment of the present invention.
- the load sharing method in this embodiment may include the following steps.
- Step 101 obtaining a current load value.
- Step 102 if the current load value exceeds a preset load threshold value, interacting with middle base stations built in an MME of a requesting base station through load state signaling, and selecting a sharing base station.
- Step 103 transmitting information of a shared load that needs to be shared to the selected sharing base station.
- Step 104 sharing the shared load to the sharing base station according to baseband resource prepared based on the information of the shared load.
- the load threshold value in this embodiment is the load threshold value for the requesting base station to ensure quality of service (quality of service, QoS for short) for UE. If the current load value is smaller than this load threshold value, the requesting base station can ensure the QoS for an accessed UE. If the current load value is greater than this load threshold value, the requesting base station cannot ensure the QoS for an accessed UE.
- the load sharing method provided in this embodiment of the present invention may use two modes for sharing the services of UE.
- the requesting base station shares all services of one or more UEs to the sharing base station.
- the requesting base station shares some services of one or more UEs to the sharing base station.
- the information of the shared load in this embodiment may include UE information such as the context information of the UE for load sharing and ID (e.g., AP ID) of the UE in the MME.
- ID e.g., AP ID
- the information of the shared load in this embodiment further includes service information such as service ID in load sharing.
- the overloaded requesting base station can share the load to be shared to one or more sharing base stations configured in the homing MME so that UEs can use the radio resource of the heavy-load base station and use the baseband resource of other light-load base stations to ensure the QoS, thereby properly using baseband resource sharing of light-load base stations, balancing the base station load, and improving the usage rate of radio baseband resource.
- FIG. 2 shows a process of a load sharing method in a second embodiment of the present invention.
- the load sharing method in this embodiment may include the following steps.
- Step 201 when a current load value of a requesting base station exceeds a preset load threshold value, receiving information of a shared load that needs sent by a requesting base station.
- Step 202 preparing baseband resource based on the information of the shared load for the requesting base station to share the shared load to a sharing base station.
- the load sharing method provided in this embodiment of the present invention may use two modes for sharing the services of UE.
- the requesting base station shares all services of one or more UEs to the sharing base station.
- the requesting base station shares some services of one or more UEs to the sharing base station.
- the information of the shared load in this embodiment may include UE information such as the context information of the UE for load sharing and ID (e.g., AP ID) of the UE in the MME.
- ID e.g., AP ID
- the information of the shared load in this embodiment further includes service information such as service ID in load sharing.
- the sharing base station can prepare relevant baseband resource for the corresponding shared load between base station and MME based on the information of the shared load, and use the relevant baseband resource for the corresponding shared load to receive load-sharing data from the EPC. In this manner, after relevant processing of the load-sharing data, the requesting base station can deliver the load-sharing data to relevant UEs. As a result, the requesting base station with an excessively heavy load currently can share the load to the sharing base station with a light load.
- the overloaded requesting base station can share the load to be shared to one sharing base station configured in the homing MME so that UEs can use radio resource of the heavy-load base station and use the baseband resource of other light-load base stations to ensure the QoS, thereby properly using baseband resource sharing of light-load base stations, balancing the base station load, and improving the usage rate of radio baseband resource.
- FIG. 3 shows a process of a load sharing method in a third embodiment of the present invention.
- the load sharing method in this embodiment may include:
- Step 301 obtaining, by a requesting base station, a current load value of the requesting base station.
- Step 302 if the current load value of the requesting base station is greater than a preset load threshold value, sending, by the requesting base station, a resource status request message (resource status request) to all middle base stations configured in a homing MME of the requesting base station, wherein the resource status request message carries a shared load value that specifies the load to be shared.
- a resource status request message resource status request
- all middle base stations in a same MME that can be interconnected through the X2 interface can be configured into an base station pool (base station pool), and a relevant base station pool ID (base station pool ID) is allocated to this base station pool.
- base station pool a relevant base station pool ID
- the middle base stations in the base station pool are independent.
- the configuration of the base station pool is simple.
- the subsequent networking mode is flexible, and capacity expansion is convenient.
- the excessive load value may be defined as the expected shared load value.
- Relevant information, such as service type and service quality, of the current service may be used to define the shared load value.
- the shared load value determined through the preceding policies defines the load to be shared.
- this resource status request message may contain relevant information of the base station pool, for example, base station pool ID, relevant information of the operator to which the relevant middle base station belongs, for example, operator ID, and relevant service information, for example, service license ID.
- Table 1 lists the IEs contained in the resource status request message.
- the resource status request message in this step adds the load to report list IE.
- This IE is mandatory in the step in this embodiment of the present invention.
- the cell to report and reporting periodicity IEs are optional.
- the load threshold IE is the shared load expected by the requesting base station for other middle base stations in the same base station pool to share.
- Step 303 receiving, by the middle base stations configured in the MME, the resource status request message, and returning a resource status response message to the requesting base station based on the value of load threshold and the current load value of each middle base station, where the resource status response message carries a load information IE that specifies the current load information corresponding to the middle base station.
- the middle base station in the homing MME of the requesting base station can determine value of the load of the requesting base station that can be shared by the middle base station based on the obtained current load value, and compare the determined value with the value of the load that needs to be shared contained in the resource status request message. If the value of the load that can be shared is greater than the value of the load that needs to be shared, the middle base station returns a resource status response message to the requesting base station. Further, each middle base station can determine the value of the load that it can share based on service license (license) it can provide. Accordingly, the resource status response message may contain license ability (license ability). Table 2 lists the IEs contained in the resource status response message.
- the resource status response message in this step adds the load to report list IE, which is mandatory in this step.
- Step 304 receiving, by the requesting base station, resource status response messages from one or more middle base stations, and selecting a proper middle base station as a sharing base station according to the current load value of the middle base station and the license type in the resource status response messages, for example, selecting the middle base station with the smallest current load value as the sharing base station.
- Step 305 sending, by the requesting base station, a resource reassign request message (resource reassign request) to the selected sharing base station, where the resource reassign request message carries information of the load to be shared, for the sharing base station to prepare baseband resource corresponding to the load to be shared.
- resource reassign request message resource reassign request
- the load sharing method provided in this embodiment of the present invention may use two modes for sharing the services of UE.
- the requesting base station shares all services of one or more UEs to the sharing base station.
- the requesting base station shares some services of one or more UEs to the sharing base station.
- the information of the shared load in this embodiment may include UE information such as the context information of the UE for load sharing and ID (AP ID) of the UE in the MME.
- the information of the shared load in this embodiment further includes service information such as the service ID in load sharing.
- Step 306 receiving, by the sharing base station, the resource reassign request message, and performing baseband resource admission for the shared load requested in the resource reassign request message.
- Step 307 after baseband resource admission succeeds, sending, by the sharing base station, a path switch request (path switch request) message for establishing user plane data for relevant user load, where the message carries information of the load to be shared to request for sharing the relevant load.
- path switch request path switch request
- Step 308 after receiving the path switch request message and interacting with a service gateway (S-GW) to obtain a response from the S-GW, sending, by the MME, a path switch request ack (path switch request ack) message to the sharing base station to complete interaction between the sharing base station and the MME at the signaling plane and data plane.
- S-GW service gateway
- Step 309 receiving, by the sharing base station, the path switch request ack message, and returns a resource reassign response (resource reassign response) message to the requesting base station.
- handover request (handover request) message in the 3GPP 36.323 ⁇ 2AP protocol.
- handover request ack handover request ack
- the requesting base station After receiving the Resource Reassign Response message, the requesting base station releases the baseband resource related to the shared UE. By far, the requesting base station receives the resource reassign response message and confirms that load sharing is implemented at the signaling layer.
- Step 310 interacting, by the sharing base station, with the MME and the requesting base station, and the requesting base station shares the load to be shared to the sharing base station.
- the downlink data delivered by the core network to the UE that shares the load is transmitted to the sharing base station.
- the sharing base station transmits the data to the UE by using remote radio unit (remote radio unit, RRU for short) of the requesting base station through the CPRI interface between the sharing base station and the requesting base station.
- the uplink data is transmitted in the opposite direction.
- the load state between base stations is known through interaction of the load state signaling at the X2 interfaces of the base stations.
- a light-load base station sends a load sharing request to switch the load service of the UE from one base station to another base station, thereby balancing the load between base stations.
- Signaling interaction between base stations is implemented by adding relevant IEs to existing signaling and using the path switch signaling group interacted with the core network during switching.
- the requesting base station and middle base stations are neighboring and belong to the same MME, but serve different cells.
- the traffic volume of a cell served by an base station is different.
- the cell served by the requesting base station is in the city center, where the traffic volume at daytime is heavy.
- the load of the requesting base station is heavy.
- the cell served by a middle base station is in the residence area, where the traffic volume at daytime is light.
- the load of the middle base station is light.
- the method provided in this embodiment can share the load by scheduling neighboring sharing base stations whose load is light when the requesting base station has a heavy load.
- a sharing base station when the load of the requesting base station is heavy, a sharing base station can be selected through interaction of the load state signaling with the middle base stations configured in the same MME.
- the sharing base station interacts with the MME in the EPC.
- the relevant baseband resource of the shared load between the sharing base station and the MME are used to receive the load-sharing data delivered by the EPC.
- the sharing base station interacts with the requesting base station, and delivers the load-sharing data through the requesting base station to the relevant UE.
- some services, that is, the shared load, of the requesting base station currently with a heavy load can be processed by the sharing base station with a light load, thereby implementing switching of services between base stations.
- the base stations interact signaling through the X2 interface to share the load among base stations in flexible modes.
- the shared load can be switched dynamically between base stations, thereby properly using the baseband resource of the base station.
- the UE whose load is shared uses the radio frequency resource of the homing base station of the accessed cell, that is, the requesting base station, and the baseband resource of the sharing base station, thereby balancing the load between the requesting base station and the destination base station, reducing the load of the requesting base station, improving the usage rate of radio baseband resource, and ensuring the QoS for the UE.
- the X2 interface is used to interact signaling for load query and load sharing on the EPS network, and the CPRI interface between base stations may be used to transmit load data.
- the requesting base station with a heavy load can share the load to be shared to a sharing base station configured in the same MME, enabling the UE to use the radio frequency resource of a heavy-load base station and baseband resource of other light-load base stations, thereby implementing baseband resource sharing among base stations, balancing the load among base stations, and improving the usage rate of radio baseband resource.
- FIG. 4 shows a structure of a load sharing device provided in a fourth embodiment of the present invention.
- the load sharing device in this embodiment may include a first obtaining unit 41 , a selecting unit 42 , a processing unit 43 , and a sharing unit 44 .
- the first obtaining unit 41 obtains a current load value. If the current load value exceeds a preset load threshold value, the selecting unit 42 interacts through load state signaling with middle base stations configured in an MME to which the requesting base station belongs, and selects a sharing base station.
- the processing unit 43 transmits information of a shared load that needs to be shared to the selected sharing base station.
- the sharing unit 44 shares the shared load to the sharing base station according to the baseband resource prepared by the sharing base station based on the information of the shared load.
- the method in the first embodiment of the present invention and the function of the requesting base station in the third embodiment may be implemented by the load-sharing device provided in the fourth embodiment of the present invention.
- the sharing unit in the load sharing device provided in this embodiment of the present invention may use two modes for sharing the services of UE. In one mode, the sharing unit shares all services of one or more UEs to the sharing base station. In another mode, the sharing unit shares some services of one or more UEs to the sharing base station.
- the information of the shared load in this embodiment may include UE information such as the context information of the UE for load sharing and ID (AP ID) of the UE in the MME.
- AP ID ID
- the information of the shared load in this embodiment further includes service information such as the service ID in load sharing.
- the overloaded requesting base station can share the load to be shared to one sharing base station configured in the homing MME so that UEs can use the radio resource of the heavy-load base station and use the baseband resource of other light-load base stations, thereby properly using baseband resource sharing of light-load base stations, balancing the base station load, and improving the usage rate of radio baseband resource.
- FIG. 5 shows a structure of a load sharing device provided in a fifth embodiment of the present invention.
- the load sharing device in this embodiment may include a second obtaining unit 51 and a preparing unit 52 .
- the second obtaining unit 51 receives information of a shared load to be shared sent by the requesting base station, and the preparing unit 52 prepares baseband resource based on the information of the shared load for the requesting base station to share the shared load to a sharing base station.
- the method in the second embodiment of the present invention and the function of the sharing base station in the third embodiment may be implemented by the load-sharing device provided in the fifth embodiment of the present invention.
- the preparing unit in the load sharing device provided in this embodiment of the present invention can prepare relevant baseband resource for the corresponding shared load between base station and MME based on the information of the shared load, and use the relevant baseband resource for the corresponding shared load to receive load-sharing data from the EPC. In this manner, after relevant processing of the load-sharing data, the requesting base station can deliver the load-sharing data to relevant UEs. As a result, the requesting base station with an excessively heavy load currently can share the load to the sharing base station with a light load.
- the overloaded requesting base station can share the load to be shared to one sharing base station configured in the homing MME so that UEs can use the radio resource of the heavy-load base station and use the baseband resource of other light-load base stations, thereby properly using baseband resource sharing of light-load base stations, balancing the base station load, and improving the usage rate of radio baseband resource.
- FIG. 6 shows a structure of a load sharing system provided in a sixth embodiment of the present invention.
- the load sharing system provided in this embodiment may include a requesting base station 61 and a sharing base station 62 , where the requesting base station 61 is configured to: obtain a current load value; if the current load value exceeds a preset load threshold value, interact with middle base stations built in an MME of the requesting base station 61 through load state signaling, and select the sharing base station 62 ; transmit information of a shared load that needs to be shared to the selected sharing base station 62 ; and share the shared load to the sharing base station 62 according to baseband resource prepared based on information of the shared load, and the sharing base station 62 is configured to obtain information of the shared load that needs to be shared sent by the requesting base station 61 and prepare baseband resource based on the information of the shared load.
- the requesting base station 61 in this embodiment may be a load sharing device provided in the fourth embodiment of the present invention.
- the sharing base station 62 in this embodiment may be a load sharing device provided in the fifth embodiment of the present invention.
- the program can be stored in a storage medium that can be read by a computer. When being executed, the program performs the steps in the preceding embodiments of the present invention.
- the storage medium may be ROM, RAM, disk, or CD that can store program codes.
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
A load sharing method, device, and system are disclosed. A first base station obtains a current load of the first base station. The first base station is connected to a mobility management entity (MME). The first base station selects a second base station that is also connected to the MME when the current load of the first base station exceeds a preset load threshold. Information of a load to be shared from the first base station to the second base station is transmitted so that the load to be shared can be shared with the second base station without switching a user equipment (UE) served by the first base station to the second base station.
Description
- This application is a continuation of U.S. patent application Ser. No. 13/278,776, filed on Oct. 21, 2011, which is a continuation of International Application No. PCT/CN2010/072095, filed on Apr. 23, 2010, which claims priority to Chinese Patent Application No. 200910082554.X, filed on Apr. 23, 2009. The afore-mentioned patent applications are hereby incorporated by reference in their entireties.
- The present invention relates to the field of communication technologies, and in particular, to a load sharing method, device and system.
- Evolved universal mobile telecommunication system (universal mobile telecommunication system, UMTS for short) territorial radio Access network (evolved universal mobile telecommunication system territorial radio access network, E-UTRAN for short) and evolved packet core (evolved packet core, EPC for short) to form evolved packet system (evolved packet system, EPS for short). The E-UTRAN includes a base stationbase station. On the EPS with flat system architecture, the load status between base stations can be communicated by exchanging signaling through interconnected X2 interfaces. Each base station serves a separate cell. Each base station is connected to mobility management entity (mobility management entity, MME for short) in the EPC through S1 interface.
- When implementing the present invention, the inventor finds at least the following defects of the existing technology: In the preceding system, in different time periods, the traffic volume of the cells served by each base station is different. An base station to which a cell with a light traffic volume belongs has a light load. An base station to which a cell with a heavy traffic volume belongs has a heavy load. As a result, the load on base stations is unshared, thereby lightering the usage rate of radio baseband resource.
- A load sharing method, device and system are provided in embodiments of the present invention.
- A load sharing method is provided in an embodiment of the present invention. The load sharing method includes obtaining a current load value, if the current load value exceeds a preset load threshold value, interacting with middle base stations built in an MME of a requesting base station through load state signaling, and selecting a sharing base station, transmitting information of a shared load that needs to be shared to the selected sharing base station, and sharing the shared load to the sharing base station according to baseband resource prepared based on information of the shared load.
- Another load sharing method is provided in an embodiment of the present invention. The load sharing method includes when a current load value of a requesting base station exceeds a preset load threshold value, receiving information of a shared load that needs to be shared sent by the requesting base station, and preparing baseband resource based on the information of the shared load for the requesting base station to share the shared load to a sharing base station.
- A load sharing device is provided in an embodiment of the present invention. The device includes a first obtaining unit, configured to obtain a current load value, a selecting unit, configured to: if the current load value exceeds a preset load threshold value, interact with middle base stations built in an MME of a requesting base station through load state signaling, and select a sharing base station, a processing unit, configured to transmit information of a shared load that needs to be shared to the selected sharing base station, and a sharing unit, configured to share the shared load to the sharing base station according to baseband resource prepared based on information of the shared load.
- Another load sharing device is provided in an embodiment of the present invention. The device includes a second obtaining unit, configured to: when a current load value of a requesting base station exceeds a preset load threshold value, receive information of a shared load that needs to be shared sent by the requesting base station, and a preparing unit, configured to prepare baseband resource based on the information of the shared load for the requesting base station to share the shared load to a sharing base station.
- A load sharing system is provided in an embodiment of the present invention. The system includes a requesting base station and a sharing base station, wherein the requesting base station is configured to: obtain a current load value; if the current load value exceeds a preset load threshold value, interact with middle base stations built in an MME of the requesting base station through load state signaling, and select the sharing base station; transmit information of a shared load that needs to be shared to the selected sharing base station; and share the shared load to the sharing base station according to baseband resource prepared based on information of the shared load, and the sharing base station is configured to obtain the information of the shared load that needs to be shared sent by the requesting base station and prepare baseband resource based on the information of the shared load.
- It can be understood from the preceding technical scheme that when the requesting base station in the embodiment of the present invention detects an excessively heavy load, a sharing base station is selected from the middle base stations configured in the same MME to share the load to be shared. A terminal that shares services can use the radio frequency resource of a heavy-load base station, that is, the requesting base station, and uses the baseband resource of other light-load base station, that is, the sharing base station, thereby balancing the load among base stations, improving the usage rate of radio baseband resource, fully using different devices of the operator, and saving the cost.
- To better illustrate technical solutions in embodiments of the present invention or in the prior art, the drawings that need to be used in embodiments of the present invention or the description of existing technologies are introduced briefly. Obviously, the drawings merely reflect some embodiments of the present invention. Those skilled in the art can obtain other drawings based on these drawings without innovative work.
-
FIG. 1 shows a process of a load sharing method provided in a first embodiment of the present invention; -
FIG. 2 shows a process of a load sharing method provided in a second embodiment of the present invention; -
FIG. 3 shows a process of a load sharing method provided in a third embodiment of the present invention; -
FIG. 4 shows a structure of a load sharing device provided in a fourth embodiment of the present invention; -
FIG. 5 shows a structure of a load sharing device provided in a fifth embodiment of the present invention; and -
FIG. 6 shows a structure of a load sharing system provided in a sixth embodiment of the present invention. - The technical solution under the present invention is elaborated below with reference to the accompanying drawings. Evidently, the embodiments described below are for the exemplary purpose only, without covering all embodiments of the present invention. All the other embodiments obtained by those skilled in the art without creative work based on the embodiments of the present invention are protected by the present invention.
-
FIG. 1 shows a process of a load sharing method provided in a first embodiment of the present invention. The load sharing method in this embodiment may include the following steps. - Step 101: obtaining a current load value.
- Step 102: if the current load value exceeds a preset load threshold value, interacting with middle base stations built in an MME of a requesting base station through load state signaling, and selecting a sharing base station.
- Step 103: transmitting information of a shared load that needs to be shared to the selected sharing base station.
- Step 104: sharing the shared load to the sharing base station according to baseband resource prepared based on the information of the shared load.
- The load threshold value in this embodiment is the load threshold value for the requesting base station to ensure quality of service (quality of service, QoS for short) for UE. If the current load value is smaller than this load threshold value, the requesting base station can ensure the QoS for an accessed UE. If the current load value is greater than this load threshold value, the requesting base station cannot ensure the QoS for an accessed UE.
- The load sharing method provided in this embodiment of the present invention may use two modes for sharing the services of UE. In one mode, the requesting base station shares all services of one or more UEs to the sharing base station. In another mode, the requesting base station shares some services of one or more UEs to the sharing base station. For the first mode, the information of the shared load in this embodiment may include UE information such as the context information of the UE for load sharing and ID (e.g., AP ID) of the UE in the MME. For the second mode, the information of the shared load in this embodiment further includes service information such as service ID in load sharing.
- In this embodiment, the overloaded requesting base station can share the load to be shared to one or more sharing base stations configured in the homing MME so that UEs can use the radio resource of the heavy-load base station and use the baseband resource of other light-load base stations to ensure the QoS, thereby properly using baseband resource sharing of light-load base stations, balancing the base station load, and improving the usage rate of radio baseband resource.
-
FIG. 2 shows a process of a load sharing method in a second embodiment of the present invention. The load sharing method in this embodiment may include the following steps. - Step 201: when a current load value of a requesting base station exceeds a preset load threshold value, receiving information of a shared load that needs sent by a requesting base station.
- Step 202: preparing baseband resource based on the information of the shared load for the requesting base station to share the shared load to a sharing base station.
- The load sharing method provided in this embodiment of the present invention may use two modes for sharing the services of UE. In one mode, the requesting base station shares all services of one or more UEs to the sharing base station. In another mode, the requesting base station shares some services of one or more UEs to the sharing base station. For the first mode, the information of the shared load in this embodiment may include UE information such as the context information of the UE for load sharing and ID (e.g., AP ID) of the UE in the MME. For the second mode, the information of the shared load in this embodiment further includes service information such as service ID in load sharing. The sharing base station can prepare relevant baseband resource for the corresponding shared load between base station and MME based on the information of the shared load, and use the relevant baseband resource for the corresponding shared load to receive load-sharing data from the EPC. In this manner, after relevant processing of the load-sharing data, the requesting base station can deliver the load-sharing data to relevant UEs. As a result, the requesting base station with an excessively heavy load currently can share the load to the sharing base station with a light load.
- In this embodiment, the overloaded requesting base station can share the load to be shared to one sharing base station configured in the homing MME so that UEs can use radio resource of the heavy-load base station and use the baseband resource of other light-load base stations to ensure the QoS, thereby properly using baseband resource sharing of light-load base stations, balancing the base station load, and improving the usage rate of radio baseband resource.
-
FIG. 3 shows a process of a load sharing method in a third embodiment of the present invention. The load sharing method in this embodiment may include: - Step 301: obtaining, by a requesting base station, a current load value of the requesting base station.
- Step 302: if the current load value of the requesting base station is greater than a preset load threshold value, sending, by the requesting base station, a resource status request message (resource status request) to all middle base stations configured in a homing MME of the requesting base station, wherein the resource status request message carries a shared load value that specifies the load to be shared.
- In this embodiment, all middle base stations in a same MME that can be interconnected through the X2 interface can be configured into an base station pool (base station pool), and a relevant base station pool ID (base station pool ID) is allocated to this base station pool. The middle base stations in the base station pool are independent. The configuration of the base station pool is simple. The subsequent networking mode is flexible, and capacity expansion is convenient.
- Different policies may be used to determine the shared load value. For example, the excessive load value may be defined as the expected shared load value. Relevant information, such as service type and service quality, of the current service may be used to define the shared load value. The shared load value determined through the preceding policies defines the load to be shared.
- Further, this resource status request message may contain relevant information of the base station pool, for example, base station pool ID, relevant information of the operator to which the relevant middle base station belongs, for example, operator ID, and relevant service information, for example, service license ID. Table 1 lists the IEs contained in the resource status request message.
-
TABLE 1 IES CONTAINED IN THE RESOURCE STATUS REQUEST MESSAGE IE Name Mandatory or Not Status in the Protocol Message Type Mandatory (M) Existing Registration Request Mandatory (M) Existing Cell To Report List Existing >Cell ID Mandatory (M) Existing Reporting Periodicity Optional (O) Existing Load To Report List Mandatory (M) Newly added >eNodeB Pool ID Mandatory (M) Newly added >Load Threshold Mandatory (M) Newly added >Operator ID Mandatory (M) Newly added - Compared with the current signaling, the resource status request message in this step adds the load to report list IE. This IE is mandatory in the step in this embodiment of the present invention. The cell to report and reporting periodicity IEs are optional. The load threshold IE is the shared load expected by the requesting base station for other middle base stations in the same base station pool to share.
- Step 303: receiving, by the middle base stations configured in the MME, the resource status request message, and returning a resource status response message to the requesting base station based on the value of load threshold and the current load value of each middle base station, where the resource status response message carries a load information IE that specifies the current load information corresponding to the middle base station.
- After receiving the resource status request message, the middle base station in the homing MME of the requesting base station can determine value of the load of the requesting base station that can be shared by the middle base station based on the obtained current load value, and compare the determined value with the value of the load that needs to be shared contained in the resource status request message. If the value of the load that can be shared is greater than the value of the load that needs to be shared, the middle base station returns a resource status response message to the requesting base station. Further, each middle base station can determine the value of the load that it can share based on service license (license) it can provide. Accordingly, the resource status response message may contain license ability (license ability). Table 2 lists the IEs contained in the resource status response message.
-
TABLE 2 IES CONTAINED IN THE RESOURCE STATUS RESPONSE MESSAGE IE Name Mandatory or Not Status in the Protocol Message Type Mandatory (M) Existing Criticality Diagnostics Mandatory (M) Existing Load Report List Mandatory (M) Newly added Operator ID Mandatory (M) Newly added Licenses Ability Mandatory (M) Newly added Load Information Mandatory (M) Newly added - Compared with the existing signaling, the resource status response message in this step adds the load to report list IE, which is mandatory in this step.
- Step 304: receiving, by the requesting base station, resource status response messages from one or more middle base stations, and selecting a proper middle base station as a sharing base station according to the current load value of the middle base station and the license type in the resource status response messages, for example, selecting the middle base station with the smallest current load value as the sharing base station.
- Step 305: sending, by the requesting base station, a resource reassign request message (resource reassign request) to the selected sharing base station, where the resource reassign request message carries information of the load to be shared, for the sharing base station to prepare baseband resource corresponding to the load to be shared.
- The load sharing method provided in this embodiment of the present invention may use two modes for sharing the services of UE. In one mode, the requesting base station shares all services of one or more UEs to the sharing base station. In another mode, the requesting base station shares some services of one or more UEs to the sharing base station. For the first mode, the information of the shared load in this embodiment may include UE information such as the context information of the UE for load sharing and ID (AP ID) of the UE in the MME. For the second mode, the information of the shared load in this embodiment further includes service information such as the service ID in load sharing.
- Step 306: receiving, by the sharing base station, the resource reassign request message, and performing baseband resource admission for the shared load requested in the resource reassign request message.
- Step 307: after baseband resource admission succeeds, sending, by the sharing base station, a path switch request (path switch request) message for establishing user plane data for relevant user load, where the message carries information of the load to be shared to request for sharing the relevant load.
- Step 308: after receiving the path switch request message and interacting with a service gateway (S-GW) to obtain a response from the S-GW, sending, by the MME, a path switch request ack (path switch request ack) message to the sharing base station to complete interaction between the sharing base station and the MME at the signaling plane and data plane.
- Step 309: receiving, by the sharing base station, the path switch request ack message, and returns a resource reassign response (resource reassign response) message to the requesting base station.
- For details about the Resource Reassign Request message in
step 305, reference may be made to handover request (handover request) message in the 3GPP 36.323×2AP protocol. For details about the Resource Reassign Response message instep 309, reference may be made to handover request ack (handover request ack) message in the 3GPP 36.323×2AP protocol. - After receiving the Resource Reassign Response message, the requesting base station releases the baseband resource related to the shared UE. By far, the requesting base station receives the resource reassign response message and confirms that load sharing is implemented at the signaling layer.
- Step 310: interacting, by the sharing base station, with the MME and the requesting base station, and the requesting base station shares the load to be shared to the sharing base station.
- By far, the downlink data delivered by the core network to the UE that shares the load is transmitted to the sharing base station. The sharing base station transmits the data to the UE by using remote radio unit (remote radio unit, RRU for short) of the requesting base station through the CPRI interface between the sharing base station and the requesting base station. The uplink data is transmitted in the opposite direction.
- In this embodiment of the present invention, the load state between base stations is known through interaction of the load state signaling at the X2 interfaces of the base stations. When the load of a certain base station is unshared, a light-load base station sends a load sharing request to switch the load service of the UE from one base station to another base station, thereby balancing the load between base stations. Signaling interaction between base stations is implemented by adding relevant IEs to existing signaling and using the path switch signaling group interacted with the core network during switching.
- In this embodiment, the requesting base station and middle base stations (including the sharing base station) are neighboring and belong to the same MME, but serve different cells. In different time periods, the traffic volume of a cell served by an base station is different. For example, the cell served by the requesting base station is in the city center, where the traffic volume at daytime is heavy. As a result, the load of the requesting base station is heavy. The cell served by a middle base station is in the residence area, where the traffic volume at daytime is light. As a result, the load of the middle base station is light. In this case, the usage of resource among base stations is unshared. The method provided in this embodiment can share the load by scheduling neighboring sharing base stations whose load is light when the requesting base station has a heavy load. In this embodiment, when the load of the requesting base station is heavy, a sharing base station can be selected through interaction of the load state signaling with the middle base stations configured in the same MME. The sharing base station interacts with the MME in the EPC. The relevant baseband resource of the shared load between the sharing base station and the MME are used to receive the load-sharing data delivered by the EPC. After relevant processing on the load-sharing data, the sharing base station interacts with the requesting base station, and delivers the load-sharing data through the requesting base station to the relevant UE. In this case, some services, that is, the shared load, of the requesting base station currently with a heavy load can be processed by the sharing base station with a light load, thereby implementing switching of services between base stations.
- When the UE does not meet the switching conditions, the base stations interact signaling through the X2 interface to share the load among base stations in flexible modes. The shared load can be switched dynamically between base stations, thereby properly using the baseband resource of the base station. The UE whose load is shared uses the radio frequency resource of the homing base station of the accessed cell, that is, the requesting base station, and the baseband resource of the sharing base station, thereby balancing the load between the requesting base station and the destination base station, reducing the load of the requesting base station, improving the usage rate of radio baseband resource, and ensuring the QoS for the UE.
- In this embodiment, the X2 interface is used to interact signaling for load query and load sharing on the EPS network, and the CPRI interface between base stations may be used to transmit load data. In this case, in the base station pool configured in the MME, the requesting base station with a heavy load can share the load to be shared to a sharing base station configured in the same MME, enabling the UE to use the radio frequency resource of a heavy-load base station and baseband resource of other light-load base stations, thereby implementing baseband resource sharing among base stations, balancing the load among base stations, and improving the usage rate of radio baseband resource.
-
FIG. 4 shows a structure of a load sharing device provided in a fourth embodiment of the present invention. The load sharing device in this embodiment may include a first obtainingunit 41, a selectingunit 42, aprocessing unit 43, and asharing unit 44. The first obtainingunit 41 obtains a current load value. If the current load value exceeds a preset load threshold value, the selectingunit 42 interacts through load state signaling with middle base stations configured in an MME to which the requesting base station belongs, and selects a sharing base station. Theprocessing unit 43 transmits information of a shared load that needs to be shared to the selected sharing base station. Thesharing unit 44 shares the shared load to the sharing base station according to the baseband resource prepared by the sharing base station based on the information of the shared load. - The method in the first embodiment of the present invention and the function of the requesting base station in the third embodiment may be implemented by the load-sharing device provided in the fourth embodiment of the present invention.
- The sharing unit in the load sharing device provided in this embodiment of the present invention may use two modes for sharing the services of UE. In one mode, the sharing unit shares all services of one or more UEs to the sharing base station. In another mode, the sharing unit shares some services of one or more UEs to the sharing base station. For the first mode, the information of the shared load in this embodiment may include UE information such as the context information of the UE for load sharing and ID (AP ID) of the UE in the MME. For the second mode, the information of the shared load in this embodiment further includes service information such as the service ID in load sharing.
- In this embodiment, the overloaded requesting base station can share the load to be shared to one sharing base station configured in the homing MME so that UEs can use the radio resource of the heavy-load base station and use the baseband resource of other light-load base stations, thereby properly using baseband resource sharing of light-load base stations, balancing the base station load, and improving the usage rate of radio baseband resource.
-
FIG. 5 shows a structure of a load sharing device provided in a fifth embodiment of the present invention. The load sharing device in this embodiment may include a second obtainingunit 51 and a preparingunit 52. When the current load value of a requesting base station exceeds a preset load threshold value, the second obtainingunit 51 receives information of a shared load to be shared sent by the requesting base station, and the preparingunit 52 prepares baseband resource based on the information of the shared load for the requesting base station to share the shared load to a sharing base station. - The method in the second embodiment of the present invention and the function of the sharing base station in the third embodiment may be implemented by the load-sharing device provided in the fifth embodiment of the present invention.
- The preparing unit in the load sharing device provided in this embodiment of the present invention can prepare relevant baseband resource for the corresponding shared load between base station and MME based on the information of the shared load, and use the relevant baseband resource for the corresponding shared load to receive load-sharing data from the EPC. In this manner, after relevant processing of the load-sharing data, the requesting base station can deliver the load-sharing data to relevant UEs. As a result, the requesting base station with an excessively heavy load currently can share the load to the sharing base station with a light load.
- In this embodiment, the overloaded requesting base station can share the load to be shared to one sharing base station configured in the homing MME so that UEs can use the radio resource of the heavy-load base station and use the baseband resource of other light-load base stations, thereby properly using baseband resource sharing of light-load base stations, balancing the base station load, and improving the usage rate of radio baseband resource.
-
FIG. 6 shows a structure of a load sharing system provided in a sixth embodiment of the present invention. The load sharing system provided in this embodiment may include a requestingbase station 61 and asharing base station 62, where the requestingbase station 61 is configured to: obtain a current load value; if the current load value exceeds a preset load threshold value, interact with middle base stations built in an MME of the requestingbase station 61 through load state signaling, and select thesharing base station 62; transmit information of a shared load that needs to be shared to the selectedsharing base station 62; and share the shared load to thesharing base station 62 according to baseband resource prepared based on information of the shared load, and thesharing base station 62 is configured to obtain information of the shared load that needs to be shared sent by the requestingbase station 61 and prepare baseband resource based on the information of the shared load. - The requesting
base station 61 in this embodiment may be a load sharing device provided in the fourth embodiment of the present invention. Thesharing base station 62 in this embodiment may be a load sharing device provided in the fifth embodiment of the present invention. - It can be understood by those skilled in the art that all or some steps in the preceding embodiments of the present invention can be performed by instructing related hardware through a program. The program can be stored in a storage medium that can be read by a computer. When being executed, the program performs the steps in the preceding embodiments of the present invention. The storage medium may be ROM, RAM, disk, or CD that can store program codes.
- The preceding embodiments are intended to describe the technical scheme revealed in the present invention but not to confine the invention. It is understandable to those skilled in the art that modifications or equivalent replacements can be made on the technical scheme provided in embodiments of the present invention without departing from the spirit and scope of the technical scheme provided in the present invention.
Claims (17)
1. A method, comprising:
obtaining, by a first base station, a current load of the first base station, the first base station being connected to a mobility management entity (MME);
selecting, by the first base station, a second base station also connected to the MME when the current load of the first base station exceeds a preset load threshold; and
transmitting information of a load to be shared from the first base station to the second base station so that the load to be shared can be shared with the second base station without switching a user equipment (UE) served by the first base station to the second base station.
2. The method according to claim 1 , wherein the selecting comprises:
sending, by the first base station, a resource status request message indicating the load to be shared to a plurality of base stations also connected to the MME when the current load of the first base station exceeds a preset load threshold;
receiving, by the first base station, a resource status response message indicating the current load of one base station in the plurality of base stations; and
selecting, by the first base station, the one base station as the second base station based on the current load of one base station and the load to be shared.
3. The method according to claim 2 , wherein, the resource status request message carries at least one or any combination of the following: base station pool ID, operator ID, and service license ID.
4. The method according to claim 1 , wherein the selecting comprises:
sending, by the first base station, a resource status request message indicating the load to be shared to a plurality of base stations also connected to the MME when the current load of the first base station exceeds a preset load threshold;
receiving, by the first base station, a plurality of resource status response messages from the plurality of base stations, each resource status response message indicating a current load of its respective base station in the plurality of base stations; and
selecting, by the first base station, as the second base station one of the plurality of base stations with the lowest current load among the plurality of base stations.
5. The method according to claim 1 , wherein the transmitting comprise transmitting a resource reassign request message carrying the information of the load to be shared to the second base station.
6. The method according to claim 1 , wherein the information of the load to be shared comprises context information of a user equipment (UE) corresponding to the load to be shared, or a UE ID in the MME.
7. The method according to claim 1 , wherein the information of the load to be shared comprises a service ID of the load to be shared.
8. The method according to claim 1 , wherein the load to be shared is a residual of the current load of the first base station exceeding the preset load threshold.
9. The method according to claim 1 , wherein the current load of the first base station comprises a service of the UE served by the first base station.
10. A method, comprising:
receiving at a second base station from a first base station, the information relating to a load to be shared by the first base station to be shared with the second base station without switching a user equipment (UE) served by the first base station to the second base station, the information received when a current load of the first base station exceeds a preset load threshold; and
preparing, by the second base station, a baseband resource based on the information of the load to be shared to share the load with the first base station.
11. The method according to claim 10 , wherein the receiving comprise receiving a resource reassign request message carrying the information of the load to be shared sent by the first base station.
12. The method according to claim 10 , wherein the preparing comprises:
performing baseband resource admission for the load to be shared in the resource reassign request message; and
transmitting a path switch request message carrying the information of the load to be shared to a mobility management entity (MME).
13. The method according to claim 10 , wherein the information of the load to be shared comprises context information of a user equipment (UE) corresponding to the load to be shared, or a UE ID in the MME.
14. The method according to claim 10 , further comprising:
receiving, by the second base station, a resource status request message carrying the load to be shared, wherein the resource status request message carries at least one or any combination of the following: base station pool ID, operator ID, and service license ID.
15. A base station, comprising:
an obtaining unit configured to obtain a current load of the base station, the base station being connected to a mobility management entity (MME);
a selecting unit configured to select a second base station also connected to the MME when the current load of the base station exceeds a preset load threshold; and
a transmitting unit configured to transmit information of the load to be shared to the second base station, so that the load can be shared with the second base station without switching a user equipment (UE) served by the first base station to the second base station.
16. A base station, comprising:
an obtaining unit configured to receive information of a load to be shared by a first base station, so that the load can be shared with the base station without switching a user equipment (UE) served by the first base station to the base station when a current load of the first base station exceeds a preset load threshold; and
a preparing unit configured to prepare baseband resource based on the information of the load to be shared to share the load with the first base station.
17. A system comprising:
a first base station connected to a mobility management entity (MME); and
a second base station also connected to the MME,
wherein the first base station is configured to select the second base station to share a load with the first base station without switching a user equipment (UE) from the first base station to the second base station, when a current load of the first base station exceeds a preset load threshold and to transmit information of the load to be shared to the second base station; and
wherein the second base station is configured to receive the information of the load to be shared sent by the first base station, and to prepare a baseband resource based on the information of the load to be shared to share the load for the first base station.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| US13/932,992 US20130286841A1 (en) | 2009-04-23 | 2013-07-01 | Load Sharing Method, Device, and System |
Applications Claiming Priority (5)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN200910082554.X | 2009-04-23 | ||
| CN200910082554A CN101541041A (en) | 2009-04-23 | 2009-04-23 | Method for sharing load, device and system thereof |
| PCT/CN2010/072095 WO2010121560A1 (en) | 2009-04-23 | 2010-04-23 | Load sharing method, device and system thereof |
| US13/278,776 US8498653B2 (en) | 2009-04-23 | 2011-10-21 | Load sharing method, device, and system |
| US13/932,992 US20130286841A1 (en) | 2009-04-23 | 2013-07-01 | Load Sharing Method, Device, and System |
Related Parent Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US13/278,776 Continuation US8498653B2 (en) | 2009-04-23 | 2011-10-21 | Load sharing method, device, and system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| US20130286841A1 true US20130286841A1 (en) | 2013-10-31 |
Family
ID=41123953
Family Applications (2)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US13/278,776 Expired - Fee Related US8498653B2 (en) | 2009-04-23 | 2011-10-21 | Load sharing method, device, and system |
| US13/932,992 Abandoned US20130286841A1 (en) | 2009-04-23 | 2013-07-01 | Load Sharing Method, Device, and System |
Family Applications Before (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| US13/278,776 Expired - Fee Related US8498653B2 (en) | 2009-04-23 | 2011-10-21 | Load sharing method, device, and system |
Country Status (6)
| Country | Link |
|---|---|
| US (2) | US8498653B2 (en) |
| EP (3) | EP2416605B1 (en) |
| CN (2) | CN101541041A (en) |
| BR (1) | BRPI1014273B1 (en) |
| ES (1) | ES2498948T3 (en) |
| WO (1) | WO2010121560A1 (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20150220330A1 (en) * | 2014-01-31 | 2015-08-06 | Dell Products L.P. | Template derivation for configuration object management |
| US9615194B2 (en) | 2010-08-26 | 2017-04-04 | Huawei Technologies Co., Ltd. | Service control method for machine type communications device and related apparatus and system |
| US9843963B2 (en) | 2012-01-20 | 2017-12-12 | Huawei Technologies Co., Ltd. | Load balance method and relevant apparatuses |
Families Citing this family (56)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB2458258A (en) | 2008-02-04 | 2009-09-16 | Nec Corp | Method of controlling base station loading in a mobile communication system |
| CN101730145B (en) * | 2008-10-29 | 2012-07-25 | 上海华为技术有限公司 | Method, device and system of load balancing |
| CN101541041A (en) | 2009-04-23 | 2009-09-23 | 华为技术有限公司 | Method for sharing load, device and system thereof |
| CN102131237B (en) * | 2010-01-12 | 2013-12-11 | 电信科学技术研究院 | Load balancing method and device |
| CN101835165A (en) * | 2010-04-30 | 2010-09-15 | 上海华为技术有限公司 | Method and system for cell re-establishment based on hardware failure |
| CN102256304B (en) * | 2010-05-19 | 2013-12-04 | 电信科学技术研究院 | Base station communication method and base station |
| WO2011150555A1 (en) * | 2010-06-02 | 2011-12-08 | 中兴通讯股份有限公司 | Method, system and network device for load balancing among network nodes |
| CN102448118B (en) * | 2010-09-30 | 2015-03-04 | 电信科学技术研究院 | Method and device for reporting resource state in relay system |
| CN102480378A (en) * | 2010-11-26 | 2012-05-30 | 中兴通讯股份有限公司 | Method and system for managing resources |
| CN102685811A (en) * | 2011-03-14 | 2012-09-19 | 中兴通讯股份有限公司 | Method and system for transmitting community resource status information under network sharing scene |
| GB2490968A (en) * | 2011-05-20 | 2012-11-21 | Nec Corp | Sharing radio access networks fairly between multiple operators |
| US8873398B2 (en) * | 2011-05-23 | 2014-10-28 | Telefonaktiebolaget L M Ericsson (Publ) | Implementing EPC in a cloud computer with openflow data plane |
| JP5306417B2 (en) * | 2011-06-02 | 2013-10-02 | 株式会社エヌ・ティ・ティ・ドコモ | Radio control base station and connection destination exchange station determination method |
| JP2012257091A (en) * | 2011-06-09 | 2012-12-27 | Fujitsu Ltd | Mobile communication system, base station device, and baseband processing allocation method |
| CN102325375A (en) * | 2011-06-29 | 2012-01-18 | 中兴通讯股份有限公司 | Resource allocation method and device |
| CN102946618B (en) * | 2011-08-16 | 2015-12-09 | 华为技术有限公司 | Load sharing method, base station, subscriber equipment, load sharing nodes and system |
| CN102958168A (en) * | 2011-08-30 | 2013-03-06 | 中兴通讯股份有限公司 | Cognitive radio system resource redistributing method and system |
| BR112014001865B1 (en) * | 2011-08-30 | 2021-10-26 | Telefonaktiebolaget Lm Ericsson | METHOD AT A FIRST NETWORK NODE FOR MEASURING PROCESSING POWER AT A SECOND NETWORK NODE, AND FIRST NETWORK NODE |
| US20140219125A1 (en) * | 2011-09-16 | 2014-08-07 | Hitachi, Ltd. | Base-station device and communication method |
| CN103168497B (en) * | 2011-10-17 | 2016-03-09 | 华为技术有限公司 | The process of signal resource overload, transfer resource overload processing method and equipment and system |
| CN103108334B (en) * | 2011-11-10 | 2018-08-17 | 南京中兴新软件有限责任公司 | A kind of system loading dynamic adjusting method of radio frequency stretch system |
| CN103139814A (en) * | 2011-11-24 | 2013-06-05 | 中兴通讯股份有限公司 | Base band load processing method and deivce |
| CN102547719A (en) * | 2011-12-12 | 2012-07-04 | 大唐移动通信设备有限公司 | Method and device for configuring tidal effect |
| CN103209486B (en) * | 2012-01-16 | 2016-07-06 | 中兴通讯股份有限公司 | The method for processing business shared based on base-band resource and system |
| HK1221853A1 (en) | 2012-02-24 | 2017-06-09 | Apple Inc. | Cooperative radio access network with centralized base station baseband unit (bbu) processing pool |
| CN102595483B (en) * | 2012-03-09 | 2014-12-24 | 新邮通信设备有限公司 | Resource state reporting method and base station |
| CN103563438B (en) * | 2012-05-18 | 2017-11-17 | 华为技术有限公司 | Communication method, device and system |
| CN102869047A (en) * | 2012-06-27 | 2013-01-09 | 中兴通讯股份有限公司 | Method and device for realizing load balance |
| US9130829B2 (en) | 2012-10-19 | 2015-09-08 | Alcatel Lucent | Methods and systems for obtaining load information in networks |
| CN103813385B (en) * | 2012-11-13 | 2017-09-12 | 中国移动通信集团河南有限公司 | A kind of distribution method and equipment of Zone resource |
| CN103916908A (en) * | 2013-01-04 | 2014-07-09 | 阿尔卡特朗讯 | Method and device for balancing load of serving cell |
| EP2753143B1 (en) * | 2013-01-08 | 2017-08-23 | Alcatel Lucent | Apparatus, method and computer program for splitting baseband data processing between a plurality of baseband processing units |
| JP6518402B2 (en) * | 2013-02-18 | 2019-05-22 | 株式会社Nttドコモ | Base station and method |
| WO2014129714A1 (en) * | 2013-02-20 | 2014-08-28 | Lg Electronics Inc. | Method and apparatus for transmitting cell load information in wireless communication system |
| KR102178540B1 (en) * | 2013-04-01 | 2020-11-13 | 삼성전자주식회사 | Scheme for congestion control in mobile communication system |
| CN104581823B (en) * | 2013-10-17 | 2019-06-21 | 中兴通讯股份有限公司 | A dynamically scalable wireless baseband processing method and device |
| CN104581825A (en) * | 2013-10-18 | 2015-04-29 | 中兴通讯股份有限公司 | Resource status acquisition method, device and system |
| US9344939B2 (en) * | 2014-01-30 | 2016-05-17 | Intel IP Corporation | Apparatus, system and method of controlling radio access technology (RAT) communication managers |
| EP3108689A1 (en) * | 2014-02-21 | 2016-12-28 | Convida Wireless, LLC | Handover in integrated small cell and wifi networks |
| CN103841647B (en) * | 2014-03-07 | 2017-04-12 | 北京邮电大学 | Multi-granularity telescopic packaging device and method based on base station resource pool |
| EP3225070A1 (en) | 2014-11-26 | 2017-10-04 | IDAC Holdings, Inc. | Initial access in high frequency wireless systems |
| WO2016090637A1 (en) * | 2014-12-12 | 2016-06-16 | 华为技术有限公司 | Baseband resource management method and device |
| US11272398B2 (en) | 2016-07-25 | 2022-03-08 | Telefonaktiebolaget Lm Ericsson (Publ) | Decentralized base station load balancing and power |
| EP3313114B1 (en) * | 2016-10-18 | 2021-06-09 | Nokia Solutions and Networks Oy | Detection and mitigation of signalling anomalies in wireless network |
| CN107733961B (en) * | 2016-10-19 | 2021-06-22 | 北京奥斯达兴业科技有限公司 | Resource allocation method and device |
| CN108259151B (en) * | 2016-12-29 | 2021-03-30 | 华为技术有限公司 | A kind of information transmission method and wireless access network equipment |
| US10979530B2 (en) | 2017-03-03 | 2021-04-13 | LGS Innovations LLC | Methods and apparatuses for batch radio resource command and control |
| EP4465551A3 (en) | 2017-08-09 | 2025-05-07 | InterDigital Patent Holdings, Inc. | Methods and systems for beam recovery and management |
| CN109992396B (en) * | 2017-12-29 | 2021-03-19 | 杭州海康威视数字技术股份有限公司 | Load control method and device, electronic equipment and distributed file system |
| EP3769570A1 (en) * | 2018-03-20 | 2021-01-27 | Nokia Technologies Oy | Apparatus, method and computer program |
| KR20210024098A (en) | 2018-06-28 | 2021-03-04 | 콘비다 와이어리스, 엘엘씨 | Prioritization Procedures for NR V2X Sidelink Shared Channel Data Transmission |
| EP3623833A1 (en) | 2018-09-11 | 2020-03-18 | Volkswagen Aktiengesellschaft | Apparatus, method and computer program for a mobile transceiver and for a base station transceiver |
| JP7431229B2 (en) | 2018-11-01 | 2024-02-14 | インターデイジタル パテント ホールディングス インコーポレイテッド | Beam failure recovery in non-faulty cells |
| WO2020155051A1 (en) * | 2019-01-31 | 2020-08-06 | Qualcomm Incorporated | Mobility load balancing in wireless communication network |
| CN110719615B (en) * | 2019-10-21 | 2021-12-28 | 广州爱浦路网络技术有限公司 | Method for user terminal to switch base station attachment |
| WO2022216215A1 (en) | 2021-04-07 | 2022-10-13 | Telefonaktiebolaget Lm Ericsson (Publ) | Methods, radio network nodes for handling communication |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6132306A (en) * | 1995-09-06 | 2000-10-17 | Cisco Systems, Inc. | Cellular communication system with dedicated repeater channels |
| US20060285523A1 (en) * | 2003-05-14 | 2006-12-21 | Matsushita Electric Industrial Co., Ltd. | Resource relocation method, base station, and radio network control device |
| US20070280159A1 (en) * | 2004-03-04 | 2007-12-06 | Utstarcom Telecom Co., Ltd | Load-Sharing Method And System In A Wireless Base Station |
| US20080318589A1 (en) * | 2004-03-05 | 2008-12-25 | Sheng Liu | Transmission Optimization in a Wireless Base Station System Based on Load-Sharing |
Family Cites Families (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN1213583C (en) * | 2002-07-03 | 2005-08-03 | 华为技术有限公司 | A method for forwarding data and signaling |
| EP1592275B1 (en) | 2004-04-29 | 2006-06-21 | Matsushita Electric Industrial Co., Ltd. | Relocation, also of parts, of radio resource management control functionality from one BTS to a second in a distributed radio access network |
| US20060142021A1 (en) * | 2004-12-29 | 2006-06-29 | Lucent Technologies, Inc. | Load balancing on shared wireless channels |
| CN100426897C (en) | 2005-01-12 | 2008-10-15 | 华为技术有限公司 | Split type base station system and networking method and baseband unit thereof |
| US20060293060A1 (en) * | 2005-06-22 | 2006-12-28 | Navini Networks, Inc. | Load balancing method for wireless communication systems |
| JPWO2008004561A1 (en) * | 2006-07-05 | 2009-12-03 | 日本電気株式会社 | Radio base station, load distribution apparatus, centralized control apparatus, radio communication system, load distribution method, and load distribution program |
| US9438521B2 (en) * | 2006-10-03 | 2016-09-06 | Telefonaktiebolaget Lm Ericsson (Publ) | Method and arrangement in a telecommunication system |
| EP1924109B1 (en) * | 2006-11-20 | 2013-11-06 | Alcatel Lucent | Method and system for wireless cellular indoor communications |
| CN101312594B (en) * | 2007-05-25 | 2011-09-14 | 华为技术有限公司 | Switch method, communication system and apparatus |
| GB2461500B (en) * | 2008-06-18 | 2010-11-10 | Motorola Inc | Load management for a mobility management entity of a cellular communication system |
| CN101730308B (en) * | 2008-10-30 | 2016-07-06 | 株式会社Ntt都科摩 | The using method of frequency spectrums in wireless honeycomb network and device |
| CN101541041A (en) * | 2009-04-23 | 2009-09-23 | 华为技术有限公司 | Method for sharing load, device and system thereof |
-
2009
- 2009-04-23 CN CN200910082554A patent/CN101541041A/en active Pending
-
2010
- 2010-04-23 ES ES12180287.0T patent/ES2498948T3/en active Active
- 2010-04-23 BR BRPI1014273-8A patent/BRPI1014273B1/en not_active IP Right Cessation
- 2010-04-23 EP EP10766650A patent/EP2416605B1/en not_active Not-in-force
- 2010-04-23 EP EP14154677.0A patent/EP2739082B1/en not_active Not-in-force
- 2010-04-23 WO PCT/CN2010/072095 patent/WO2010121560A1/en active Application Filing
- 2010-04-23 EP EP12180287.0A patent/EP2528380B1/en not_active Not-in-force
- 2010-04-23 CN CN2010800179261A patent/CN102349325B/en not_active Expired - Fee Related
-
2011
- 2011-10-21 US US13/278,776 patent/US8498653B2/en not_active Expired - Fee Related
-
2013
- 2013-07-01 US US13/932,992 patent/US20130286841A1/en not_active Abandoned
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US6132306A (en) * | 1995-09-06 | 2000-10-17 | Cisco Systems, Inc. | Cellular communication system with dedicated repeater channels |
| US20060285523A1 (en) * | 2003-05-14 | 2006-12-21 | Matsushita Electric Industrial Co., Ltd. | Resource relocation method, base station, and radio network control device |
| US20070280159A1 (en) * | 2004-03-04 | 2007-12-06 | Utstarcom Telecom Co., Ltd | Load-Sharing Method And System In A Wireless Base Station |
| US20080318589A1 (en) * | 2004-03-05 | 2008-12-25 | Sheng Liu | Transmission Optimization in a Wireless Base Station System Based on Load-Sharing |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US9615194B2 (en) | 2010-08-26 | 2017-04-04 | Huawei Technologies Co., Ltd. | Service control method for machine type communications device and related apparatus and system |
| USRE48463E1 (en) | 2010-08-26 | 2021-03-09 | Huawei Technologies Co., Ltd. | Service control method for machine type communications device and related apparatus and system |
| US9843963B2 (en) | 2012-01-20 | 2017-12-12 | Huawei Technologies Co., Ltd. | Load balance method and relevant apparatuses |
| US20150220330A1 (en) * | 2014-01-31 | 2015-08-06 | Dell Products L.P. | Template derivation for configuration object management |
| US9459859B2 (en) * | 2014-01-31 | 2016-10-04 | Dell Products L.P. | Template derivation for configuration object management |
Also Published As
| Publication number | Publication date |
|---|---|
| EP2528380A2 (en) | 2012-11-28 |
| BRPI1014273B1 (en) | 2021-03-09 |
| US8498653B2 (en) | 2013-07-30 |
| CN102349325A (en) | 2012-02-08 |
| EP2416605A4 (en) | 2012-02-08 |
| EP2528380B1 (en) | 2014-07-02 |
| EP2528380A3 (en) | 2013-01-30 |
| EP2739082A2 (en) | 2014-06-04 |
| EP2739082A3 (en) | 2014-06-11 |
| EP2416605B1 (en) | 2012-11-07 |
| CN102349325B (en) | 2013-10-09 |
| US20120040684A1 (en) | 2012-02-16 |
| EP2416605A1 (en) | 2012-02-08 |
| EP2739082B1 (en) | 2019-01-16 |
| WO2010121560A1 (en) | 2010-10-28 |
| ES2498948T3 (en) | 2014-09-26 |
| CN101541041A (en) | 2009-09-23 |
| BRPI1014273A2 (en) | 2016-04-05 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US8498653B2 (en) | Load sharing method, device, and system | |
| EP2800414B1 (en) | Load balancing method and related device | |
| CN107820291B (en) | Network slice control method and related equipment | |
| KR101617978B1 (en) | Baseband signal processing cluster | |
| KR100585290B1 (en) | Mobile base station selection method, system, and mobile base station in mobile communication system | |
| US9560628B2 (en) | Method and node for paging in a radio access network | |
| KR20120071227A (en) | Mobile communication systems for controlling load in distributed manner and method threrof | |
| JP2019519163A (en) | Communication method and device | |
| KR20140117963A (en) | Method and apparatus of traffic control in next generation mobile communication system | |
| EP1686819B1 (en) | A mobile communication system | |
| WO2021028616A1 (en) | Configurations for availability of interfaces used in v2x communications | |
| KR20140117830A (en) | Multi-cell selection method and distrubuted data transmission method to provide enhanced mobile data transmission in wireless overlay network | |
| KR20140045887A (en) | Mehtod and appartus for cell load balancing in a wireless communication system | |
| CN113873584B (en) | Cell switching method and communication device | |
| EP2039063B1 (en) | User network and method for using multiple access systems to connect to remote communications network(s) | |
| CN111357321B (en) | Method and apparatus for load balancing | |
| US9277451B1 (en) | Reduction of network loading due to multiple device connections in wireless data networks | |
| EP3565372B1 (en) | Connection establishment method and apparatus | |
| JP4645338B2 (en) | Wireless communication system, wireless control station, and service changing method used for them | |
| KR20240134720A (en) | How to add a node | |
| KR100728626B1 (en) | Handover Method in Mobile Communication System with Asynchronous and Synchronous Networks |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| STCB | Information on status: application discontinuation |
Free format text: ABANDONED -- FAILURE TO RESPOND TO AN OFFICE ACTION |