You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
Risk #3 — Measure IK+plan_path false-positive rate on a hand-labelled set #13
DESIGN.html §10 Risk #3 (medium). A task can pass IK reachability + collision-free pathing and still be physically unsolvable (gripper geometry vs object shape, friction). Need to know how often our solvability proxy is wrong.
Probe
Hand-author 20 tasks within Franka tabletop spanning easy (centred cube), borderline (off-axis, tilted target), and intentionally-hard (object too wide for gripper, target inside a wall)
Label each ground-truth solvable/unsolvable
Run our verifier and compute confusion matrix
If false-positive rate > 20 %: add post-grasp contact-stability check (cube must remain in contact during lift); re-measure
Decide
< 20 % FP: keep oracle as-is
20–50 % FP: add contact-stability check
50 % FP: reconsider solver design before scaling to M3
Activity