You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
Repository navigation
BCLI: min task list in a project with only sessions says no task boxes, not no boxes (T36 follow-up) #3203
Follow-up to BCLI T36 (#2897, PR #3184), from the arch review's note.
min task list now renders through the shared min box list path, filtered to tasks. In a project that has only session boxes, the filtered list is empty, and it prints the min box list empty-project line, which says the project has no boxes. That is false: the project has boxes, just no task boxes.
Do: when a type noun's list is empty because of the type filter, say so in that noun's words. For example, min task list on a project with sessions but no tasks says the project has no task boxes, not no boxes. Keep min box list's own empty line unchanged. Add a test with a project that has only a session box, and assert min task list's empty line.
Activity